The objective of this article is to select land for commercial buildings in Rio de Janeiro city using multiple criteria decision-making techniques. The techniques used were based on the Analytic Hierarchy Process (AHP) and Fuzzy Logic methods. These methods were chosen because of functionality, flexibility and great application in engineering problems for decision making involving multiple criteria. Its application was made through an opinion survey with expert builders, where 6 (six) factors for evaluation were selected in 10 (ten) commercial land alternatives. For the analytical operation of the methods, the software used were: Super Decisions and MATLAB®, respectively for each method, presenting the factors classified, in order of priority, in the selection of land, and ranking of the alternatives according to the defined scenario, facilitating in this way the process of selection of land for buildings, establishing a scientific way for the decision process.
INTRODUÇÃOO crescente aumento na demanda por habitação nos grandes centros urbanos provocou uma valorização considerável do metro quadrado nestes locais. Ainda assim, a procura tanto de imóveis quanto de terrenos disponíveis para construção tem sido frequente. Toda essa valorização trouxe à tona a investigação sobre a disponibilidade de terrenos para uma construtora ou um construtor adquirir visando ao aproveitamento da área para a construção de edificações (Diário do Nordeste, 2012).Dessa forma, a intensa e acelerada urbanização resulta em problemas, como a escassez de áreas adequadas para edificações nos grandes centros urbanos. A busca por terrenos disponíveis e apropriados para construção já é um problema comum às construtoras.Os estudos de localização do terreno certo englobam conjunto de procedimentos que trabalham na escala regional e urbana, chegando-se às condicionantes que determinarão a escolha do terreno que envolve complexas questões físicas e legais (Carvalho, 2005). Além da avaliação do valor, dimensões e localização, é necessário verificar se o solo e a água do local apresentam impactos gerados por atividades
A series of public policies are being adopted worldwide to seek greater participation of renewable energy sources in the energy matrix. Brazil is a country that has a predominantly renewable energy source, with hydroelectric energy being responsible for the largest portion, but with enormous potential to be exploited for solar energy. The objective of this study was to carry out an analysis of the economic viability of a photovoltaic matrix in the distributed microgeneration model from the residential consumer perspective. Through the Monte Carlo simulation, 10.000 iterations were performed and the NPV was calculated in each of them, then counted to recover the corresponding output probability distribution and verified the NPV probability to be greater than zero. The developed method has proved to be a reliable tool to support decision making and can be applied to several scenarios. The scenario adopted for the design of the photovoltaic system presented a 95.2% probability of returning with an NPV above zero and this makes it economically feasible. The main contribution of this paper is the replicability of the methodology used for other economic analysis studies.
Resumo: A construção civil apresenta altos índices de retrabalho, o que acarreta em custos adicionais e atrasos nos prazos dos projetos. Deste modo, diversos autores e entidades têm estudado o problema e buscado soluções Palavras-chave: Retrabalho; Construção civil; Montagem industrial; Análise multicritério; AHP.Abstract: Civil construction has high rework rates, which entails additional costs and delays in project deadlines. In this way, several authors and entities have studied the problem and sought solutions to try to quantify and minimize the consequences of reworking. Several rework measurement methodologies have been developed, including: Construction Industry Institute Reduction Rework Program, Best Productivity Practices Implementation Index of the Construction Industry Institute, Methodology of the Construction Owners Association of Alberta, and Measuring and Classifying Construction Field Rework . In this context, this article aims to propose a procedure, based on the multicriteria analysis method Analytic Hierarchy Process -AHP, to assist in the process of selecting the most appropriate rework measurement methodology to be adopted in subsectors of the civil construction industry. The proposed procedure was applied to the industrial assembly segment, and the Rework Reduction Program methodology presented the best results regarding the rework measurement according to five criteria selected for analysis (coverage, deployment, costs, data entry and system operation), being the most indicated for use.
This work aims to present the economic-financial feasibility, through the application of the Monte Carlo Method, to assist managers in the decision making regarding the investment of a service contract of a company specialized in Non-Destructive Tests, with the tests of Penetrant Liquid and Ultrasound, to which the company that takes the service establishes the requirements previously. The method was apply, in 5000 iterations, from the established parameters, for the initial investment and demand of the test diaries, which provided data regarding the average for the Net Present Value (NPV), Internal Rate of Return (IRR) and Profitability Index (PI), as well as the possible standard deviations, established by the coefficient of variation. Finally, after analyzing the data, it was check that the Method is useful to assist in the making of investment decisions, being feasible the adherence of the contract studied, through the analyzed data and established criteria.
Peças sobressalentes importantes devem ser mantidas em estoque e seu inventário devidamente controlado para substituir componentes desgastados e/ou defeituosos por novos e minimizar os tempos de inatividade nas diversas atividades de manutenção. No entanto, a posse de peças sobressalentes em estoque para uma pronta disponibilidade (quando são necessárias) pode implicar, em caso de peças dispendiosas e raramente usadas, altos custos de retenção de estoques. Neste trabalho, é apresentada uma abordagem de avaliação da criticidade de peças sobressalentes utilizando o método AHP com o uso de ratings (Analytic Hierarchy Process Ratings Model). A estrutura da hierarquia de decisão elaborada relaciona-se às consequências causadas pela falha de um sobressalente no processo, no caso de uma substituição não estar prontamente disponível com atributos de demanda e suprimentos, segmentando as prioridades pelos critérios Vital, Essencial e Desejável (VED). O modelo proposto foi aplicado em peças sobressalentes de baixíssimo giro de uma organização integrante de uma empresa de capital intensivo, situada no Sul Fluminense, utilizando o procedimento de Saaty para a definição de prioridades por meio do software de livre acesso Super Decisions, permitindo a priorização das peças a serem estocadas e o estabelecimento de políticas de gestão diferenciadas para cada classe.
The scenario of global competitiveness demands more and more of the organizations the search for continuous improvement. For survival, in the face of adverse market conditions, modern production management strategies are essential to make production processes increasingly efficient, lean and sustainable, minimizing losses in their production systems. In this sense, when thinking about changes in production lines, in search of improvements in their process, criteria that provide Benefits, Opportunities, Costs and Risks (BOCR) should be considered. In this way, managers and executives should rely on tools and methods that allow them to guide their decisions in a clear way. The objective of this work is to apply a method of Decision Making with Multiple Criteria to the alternatives of investment projects in production lines in Lean Manufacturing concept. As a general result, it was possible to observe the applicability of the AHP BOCR method for the decision-making case involving several criteria and subcriteria for choosing the Lean investment project in the steel environment, the preferred alternative being the discontinuity of the production line 1 and the absorption of their respective production volume by production lines 2 and 3 through investments in them.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.