The use of solar PV system in Indonesia has expanded to various field and area. One example is residential buildings in urban areas. This article discusses calculation methods for designing a solar power generation system that is applied to residential buildings, such as homes, offices, or colleges. Electricity generated from the solar home system (SHS) is used to support many kinds of electrical equipments, where the electrical equipments are used by building occupants in their daily life. The calculation method is considered from the potential of solar energy and the reliability of the on-site system to generate electricity. The system is designed in an off-grid topology by exchanging connections with the public electricity grid owned by PLN. Calculation results shows that this SHS has a generation capacity of 1 kWp, 24 V 300 Ah battery storage, and a 200 W inverter. This SHS can reduce electricity usage in this sector by 18.2 kWh in average every month.
Ngalau Baribuik Micro-hydro Power Plant (MHP) is located in Bukit Karang Putih, Lubuk Kilangan, Padang City. This MHP with a capacity of 10 kW belongs to the local community which has been operating since 2012. This MHP was built with the aim of meeting the electricity needs of the people of Nagari Ngalau Baribuik who are not covered by electricity from PLN. Based on the information obtained from the MHP management, until now the operating profile and loading pattern of the MHP which is managed independently by the community has not been identified. To overcome this problem, a community service activity was carried out to minimize the failure of the MHP in meeting the needs of the community and the worst possibility was that there was damage to the generator. The target of this activity is the people of Nagari Ngalau Baribuik who are consumers of the MHP. Through this community service activity, the people who are consumers of the Nagari Ngalau Baribuik MHP have understood the importance of saving energy to maintain the sustainability of the MHP. People also know tips for saving energy that they can apply in their daily lives. Efforts to transfer knowledge to the community have been successfully carried out through this activity.
Pasie Nan Tigo Urban Village has 20 Fishermen Groups, one of which is active is the Pantai Jaya Fishermen Group. Based on the facts and discussions with the Pantai Jaya Fishermen group it was found that the most important problem was the high operational costs required when going to sea, while the fish catches obtained were uncertain and the lack of technological touch in the fishing process. To go to sea, fishermen with Tondo Ships must prepare a minimum fund of 1.35 million rupiah, of which around 50% is used to buy fuel oil (BBM). The solution offered to solve the problem is the utilization of environmentally friendly solar energy through the solar panel technology of ship lighting systems. It is expected that from this activity can be obtained by fishing boats powered by environmentally friendly solar energy that is more economical and profitable. The use of solar panels for ship lighting systems will replace the use of generator engines which so far need fuel.
Micro Hydro (PLTMH) Ngalau Baribuik, Padang - West Sumatra, has operated since 2012. It is currently the only source of electricity for the local community, some of whom work as chicken breeders. Based on community service activities in 2021, information was obtained that the PLTMH's electricity had yet to be utilized optimally. Meanwhile, chicken breeders also needed egg incubators to increase their productivity. This community service activity aims to design an IoT-based automatic egg incubator to optimize the use of renewable energy. Activities started with field visits, making initial plans, designing and testing the machine, handing over the machine, and disseminating knowledge. The designed a smart egg incubator worked well after a 21-day hatching test for chicken eggs. The IoT technology installed on the device also functions appropriately and can show real-time temperature and humidity on mobile devices.
Indonesia intends to use renewable energy both locally and on a national scale. Regional energy planning must be developed by provincial governments in accordance with national energy planning (RUEN). One of the few provinces that has already published its regional energy planning is North Maluku Province. The ambition to use more renewable energy technologies for power generation is already taken into account in their regional energy planning. However, North Maluku Province may rely on renewable energy as their primary source of power because of the abundance of these resources. The purpose of this paper is to examine renewable energy development and planning in relation to the RUPTL 2021-2030 power development plan. This review gives an insight that North Maluku Province still have untapped renewable energy potential which can be developed in the future to increase its renewable shares in electricity mix as well as to enhance energy security and accessibility in the region.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.