2010
DOI: 10.1016/j.autcon.2009.12.005
|View full text |Cite
|
Sign up to set email alerts
|

The use of a virtual building design and construction model for developing an effective project concept in 5D environment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
76
0
5

Year Published

2016
2016
2022
2022

Publication Types

Select...
5
3
1

Relationship

1
8

Authors

Journals

citations
Cited by 124 publications
(88 citation statements)
references
References 36 publications
0
76
0
5
Order By: Relevance
“…Straipsnyje autoriai apžvelgė duomenų mainų taikant IFC standartą trūkumus ir jų sprendimus. BIM nagrinėjo V. Popov et al (2010), D. Bryde et al (2013), K. F. Chien et al (2014), R. Miettinen ir S. Paavola (2014). Informacijos valdymo sistemą statybos etape nagrinėjo bei BIM technologija pagrįstą žinių valdymo sistemą generaliniams rangovams pasiūlė Y.…”
Section: Bim Principai Ir Teritorijų Planavimasunclassified
“…Straipsnyje autoriai apžvelgė duomenų mainų taikant IFC standartą trūkumus ir jų sprendimus. BIM nagrinėjo V. Popov et al (2010), D. Bryde et al (2013), K. F. Chien et al (2014), R. Miettinen ir S. Paavola (2014). Informacijos valdymo sistemą statybos etape nagrinėjo bei BIM technologija pagrįstą žinių valdymo sistemą generaliniams rangovams pasiūlė Y.…”
Section: Bim Principai Ir Teritorijų Planavimasunclassified
“…This is completed in accordance with the actual size of this building structure modelling workshop. According to the above analysis and simulation steps, the virtual construction of the Three Gorges Pharmaceutical plant amino acid industrial base is shown in the figures below: Based on the concept of controlled 5D BIM coordination, design and construction coordination is not only in terms of the progress of the project, but is also reflected in the cost of the project [23]. This is carried out for a specific building project, in order to control the various stages of design and construction, and also to control the schedule and cost.…”
Section: Mechanical Behavior Analysis Of the Structure Of The Second mentioning
confidence: 99%
“…The best practice, knowledge, experience and "knowhow" [26,27] leads world to new approach of connecting traditional survey methods with design process and innovative technologies in construction industry [5,22,17]. [17,22], second step is to make quality assessment of completed underground structure, underground engineering utilities, and aboveground structure related with geospatial information (all GIS dimensions) and real implementation, third step is to make day-by-day "As-build" model with 3D laser scan technologies and analyse interferences according to BIM model, forth step is to make the quality assessment of completed construction works before handover of asset.…”
Section: Asset Management Decision-making Using Mcdm and Bim Techniquesmentioning
confidence: 99%
“…The best practice, knowledge, experience and "knowhow" [26,27] leads world to new approach of connecting traditional survey methods with design process and innovative technologies in construction industry [5,22,17]. take-offs, implementation time and project cost).…”
Section: Asset Management Decision-making Using Mcdm and Bim Techniquesmentioning
confidence: 99%