2017
DOI: 10.1007/s12205-017-0734-3
|View full text |Cite
|
Sign up to set email alerts
|

Improvement of Realism of 4D Objects Using Augmented Reality Objects and Actual Images of a Construction Site

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
17
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 29 publications
(17 citation statements)
references
References 13 publications
0
17
0
Order By: Relevance
“…The calculation process for the present total construction cost varies depending on the HC and RC methods. The HC method, which utilizes historical cost incurred at the time of construction, calculates the present total construction cost using Equation (16). The total construction cost should be evaluated including the costs of construction, land, and equipment.…”
Section: Asset Valuationmentioning
confidence: 99%
See 1 more Smart Citation
“…The calculation process for the present total construction cost varies depending on the HC and RC methods. The HC method, which utilizes historical cost incurred at the time of construction, calculates the present total construction cost using Equation (16). The total construction cost should be evaluated including the costs of construction, land, and equipment.…”
Section: Asset Valuationmentioning
confidence: 99%
“…The information involved in each stage (planning, design, construction, and maintenance) is determined by the requirements of the consumer, and links between pieces of information in each management stage must be created to manage the entire lifecycle information of the bridge via BIM. Because of these characteristics of BIM, studies on the design/construction stage, such as crash checks, schedule and cost management, quantity calculation, and design modification of the bridge, were conducted in advance [13][14][15][16][17]. Therefore, the use of BIM at the design/construction stages resulted in an increasing number of on-site applications due to the benefits of reduced construction periods, costs, and errors.…”
Section: Introductionmentioning
confidence: 99%
“…In research using case studies, Clemente and Cachadinha (2012) addressed the visualization of AR in updates of information regarding the progress of the building site. Kim et al (2017) examined the construction of a bridge over the AR performing simulations. In the research using the experimental approach, Chu, Matthews, and Love (2018), Shin, Park, Woo, and Jang (2013) and Shin and Dunston (2010) demonstrated detection of defects using AR was significant, improving the perception about occurrences of this nature.…”
Section: Researches Approachesmentioning
confidence: 99%
“…They concluded the solution is affordable and helps facility managers in their routine tasks, since the display space may be accompanied by information on projects in a single interface. H. S. Kim, S. K. Kim, Borrmann, and Kang (2017) proposed an AR-based 4D CAD system developed to reflect real-time construction site information and provide a practical simulation of 4D and 5D models. The system manages the schedule of activities through the images extracted in real-time, using web cameras installed in the construction site.…”
Section: Introductionmentioning
confidence: 99%
“…Both these methods allow for intuitively checking the progress and possible discrepancies between reality and design. By developping this approach further into a real-time application, faster decision-making becomes possible (Kim et al, 2018). In another work a mobile AR application that can be used on the construction site is presented.…”
Section: Related Workmentioning
confidence: 99%