Diagnóstico e análise de aditivos contratuais em obras públicas de edificações

Abstract: O objetivo desse trabalho é investigar, em uma instituição pública, as ocorrências dos aditivos contratuais de prazo e de valor em obras de edificações e quais são os seus principais fatores geradores. O trabalho apresenta os resultados preliminares de uma pesquisa exploratória. A metodologia envolveu um levantamento de solicitações de aditivos contratuais de prazo e valor em obras públicas de edificações terminadas nos últimos cinco anos e sob a responsabilidade de uma autarquia municipal, baseada em análise … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
2

Year Published

2017
2017
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 1 publication
0
1
0
2
Order By: Relevance
“…This theme was approached by Kog (2018), who identified as the main cause of construction work delay the late issuance of incomplete instructions, information or drawings, the preparation of inadequate drawings and delay in the revision and completion of the project. In addition, Santos, Starling and Andery (2014) observed in his research that the main problem in the contract amendments of periods, consequence of the delay in construction works, is related to deficiencies in the projects, more specifically the lack of compatibility, insufficient specification and unsatisfactory breakdown. Khanzadi et al (2019) further emphasize the complexity of the processes related to the projects, highlighting the various existing interconnected jobs as well as their variability and unpredictability, and that would bring about variations and delays found in the schedules.…”
Section: Delivery Of Incomplete Projectsmentioning
confidence: 99%
“…This theme was approached by Kog (2018), who identified as the main cause of construction work delay the late issuance of incomplete instructions, information or drawings, the preparation of inadequate drawings and delay in the revision and completion of the project. In addition, Santos, Starling and Andery (2014) observed in his research that the main problem in the contract amendments of periods, consequence of the delay in construction works, is related to deficiencies in the projects, more specifically the lack of compatibility, insufficient specification and unsatisfactory breakdown. Khanzadi et al (2019) further emphasize the complexity of the processes related to the projects, highlighting the various existing interconnected jobs as well as their variability and unpredictability, and that would bring about variations and delays found in the schedules.…”
Section: Delivery Of Incomplete Projectsmentioning
confidence: 99%
“…Costa et al (2005) realizou um estudo de Benchmarking com empresas da construção civil de Porto Alegre-RS, onde observou desvios de custo excedente de 1,6% em 33 obras. Santos et al (2014) investigaram 126 obras de edificações no setor público, constatando que 61% das obras apresentaram aditivo de valor, com média de acréscimo financeiro de 17%. Rasmussem (2013) detectou que 96% dos contratos celebraram aditivo de valor ou de prazo.…”
Section: -Estudos Concebidos Sobre Desvio De Custounclassified
“…Estes dados ficam abaixo dos estudos encontrados, apesar de serem de períodos diferentes, aplicando a média nos dados apresentados porCoutinho (2010) no trabalho desenvolvido nas obras de 2006 a 2009 tem-se um percentual de atraso de 59,81% para a UFPA e 71,38% para a FADESP. Já o trabalho deSantos et al (2014), em uma autarquia municipal no período de 2009 a 2013, 96% tiveram aditivo de prazo e que o tempo em média foi acrescido de 111% do previsto incialmente.…”
unclassified