Analisis Risiko Jalan Tol Tahap Pra Konstruksi (Studi Kasus Jalan Tol Pekan Baru-Dumai)

Abstract: Kota Pekanbaru dihubungkan melalui jalan menuju Kota Dumai, di Propinsi Riau yangmerupakan ruas jalur penting di Sumatera, dengan kondisi jalan 2 lajur 2 arah yang diprediksi akanmengalami overcapacity pada tahun 2015. Untuk memperlancar transportasi antara kedua kotatersebut maka direncanakanlah pembangunan jalan tol. Untuk itu perlu dilakukan identifikasirisiko pembangunan jalan tol ini sebagai salah satu bagian dari analisis kelayakannya. Penelitianini bertujuan mengidentifikasi dan mengukur besaran probabi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0
2

Year Published

2020
2020
2023
2023

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 8 publications
(8 citation statements)
references
References 1 publication
0
6
0
2
Order By: Relevance
“…These studies identified 45 significant risks affecting delays of the road construction projects in West Bank Palestine, 2013 [9], and the importance of strong government supports in the development of toll road in Argentina, tariffs collection, investment policy, and optimization of risk allocation between road users and the project concessionaire, 2002 [10]. During the pre-construction phase the development of toll project in Indonesia has identified five main risks affecting to project success encompassing; project permissions, feasibility study, detailed design, land acquisition and investment, 2015 [11]. Again a road construction research study conducted in Saudi Arabia identified 41 main factors causing cost overrun, 2013 [12].…”
Section: Introductionmentioning
confidence: 99%
“…These studies identified 45 significant risks affecting delays of the road construction projects in West Bank Palestine, 2013 [9], and the importance of strong government supports in the development of toll road in Argentina, tariffs collection, investment policy, and optimization of risk allocation between road users and the project concessionaire, 2002 [10]. During the pre-construction phase the development of toll project in Indonesia has identified five main risks affecting to project success encompassing; project permissions, feasibility study, detailed design, land acquisition and investment, 2015 [11]. Again a road construction research study conducted in Saudi Arabia identified 41 main factors causing cost overrun, 2013 [12].…”
Section: Introductionmentioning
confidence: 99%
“…The risk level analysis on the equation of investment risk factors, where the magnitude of the risk factors is a description of the level of investment risk that occurs. The risk factor equations defined as the multiplication of the impact magnitude and the risk event probability, which is calculated from the following equation, specifically [4]: [4].…”
Section: Methodsmentioning
confidence: 99%
“…Furthermore, the risk matrix shown in Figure 1, can use graphically illustrate the existing risk category. Risk analysis is categorizing risks into several categories as well as listed in Table 2 and Figure 1, where: Low risk is a risk that can be accepted or ignored; The moderate risk is the risk that has a high level of likelihood but a low impact or a low probability level but a high impact; High risk is a risk that has a high probability of occurrence and a great deal of an impact [4]. Table 3 shows, the pre-construction risk probability on the X-Y toll road project is smaller than the pre-construction risk probability in Indonesia according to the construction and building guidelines for investment risk analysis from the Ministry of Public Works Research and Development Center.…”
Section: Methodsmentioning
confidence: 99%
“…Risiko cuaca harus dibagi oleh kedua belah pihak dengan risiko yang tersisa ditanggung oleh investor (S. Santoso et al, 2012); Pembebasan lahan dalam proyek jalan raya selalu diidentifikasi sebagai risiko proyek yang paling efektif. Karena tidak adanya akuisisi yang tepat waktu menyebabkan keterlambatan dalam proses eksekutif, dan tidak hanya meningkatkan biaya dan waktu pembangunan, tetapi juga berpengaruh pada durasi kontrak, dan beberapa klaim oleh pihak swasta (Mehrizi & Bafqi, 2016); Risiko yang paling sensitif adalah Ketersediaan lahan, Proses ganti rugi, Penolakan Masyarakat, banyaknya calo tanah, dan sumber pendanaan yang belum jelas (Sandhyavitri & Saputra, 2019); Selanjutnya pada investasi proyek jalan tol, risiko tertinggi adalah pembebasan lahan. Sebelum menyelesaikannya, pembangunan tidak dapat dimulai (Sihombing, 2017).…”
Section: Risiko Lokasiunclassified