A Review of Structural Equation Model for Construction Delay Study

Abstract: Structural Equation Modelling (SEM) has been widely used in science social area compared to construction engineering and management field especially in area of delay construction. SEM is a second generation multivariate analysis that has an advance features compare to first generations of analysis tools. First generation techniques suffer with some assumptions such as error measurement is neglected, only observed variable allowed, only for simple model and other limitations. In construction delay study, compre… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 38 publications
0
3
0
Order By: Relevance
“…Many parties involved in construction projects are still unfamiliar with the methods and advances in evaluating construction disputes [13]. Meanwhile, some papers have attempted to review the issue of disputes [13]- [15]. However, there is a gap in this existing knowledge, as disputes are rarely addressed coherently and no ground rules or common approaches have been used to identify, evaluate, and address disputes.…”
Section: Contribution To the Body Of Knowledgementioning
confidence: 99%
“…Many parties involved in construction projects are still unfamiliar with the methods and advances in evaluating construction disputes [13]. Meanwhile, some papers have attempted to review the issue of disputes [13]- [15]. However, there is a gap in this existing knowledge, as disputes are rarely addressed coherently and no ground rules or common approaches have been used to identify, evaluate, and address disputes.…”
Section: Contribution To the Body Of Knowledgementioning
confidence: 99%
“…Recent research on construction delay in Indonesia only shows the project delay factor ranking in the construction industry [8]. Research on the model of construction delay had also conducted [18]. But, the research did not focus on substructure work in building construction.…”
Section: Introductionmentioning
confidence: 99%
“…Time overruns give negative impressions on the project and all the involved construction parties. Ramli et al (2018) asserted that when this happens, the overall project performance will decrease and competency of involved workers and professionals will be doubtful.…”
Section: Introductionmentioning
confidence: 99%