Development of Delay Factor Model for Substructure Works in Building Construction

Abstract: Building construction is one of the most complex construction hence construction delay is always happened. Substructure work is the first stage of building construction work. If a delay occurs in the substructure work stage, it will cause a snowball effect which can cause all of the building construction stage to be delayed. Therefore, research on the delay factor in substructure work is urgent to be mitigated at the beginning of the construction process. Identifying the delay factor is the main objective of t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(11 citation statements)
references
References 19 publications
0
2
0
Order By: Relevance
“…Regression analysis enables us to predict future outcomes based on the predictor variables. Kurniawan [51] used multiple regression in developing a delay factor model for substructure works in building construction. The type of relationship between the initial and actual or final contract duration in South Africa was determined using regression analysis [52].…”
Section: Methodsmentioning
confidence: 99%
“…Regression analysis enables us to predict future outcomes based on the predictor variables. Kurniawan [51] used multiple regression in developing a delay factor model for substructure works in building construction. The type of relationship between the initial and actual or final contract duration in South Africa was determined using regression analysis [52].…”
Section: Methodsmentioning
confidence: 99%
“…Hasil analisis Relative Important Index (RII) menunjukkan bahwa variabel Kondisi Keuangan (X5) dengan nilai RII sebesar 0.864 merupakan peringkat pertama. Kondisi keuangan atau finansial merupakan faktor yang sangat mempengaruhi keterlambatan pelaksanaan proyek [6,7].…”
Section: Analisis Riiunclassified
“…Variabel Material (X2) dengan nilai RII 0.824 merupakan peringkat kedua. Ini merupakan faktor yang sangat mempengaruhi keterlambatan [6,7]. Hal ini sangat dipengaruhi kekurangan material, perubahan spesifikasi dan kualitas material, kerusakan material, serta pengiriman yang terlambat [9,15,17,18,25].…”
Section: Analisis Riiunclassified
See 1 more Smart Citation
“…Delay is a risk in a construction project (Kurniawan et al, 2021). For this reason, it is necessary to carry out risk management to improve project time performance.…”
Section: Introductionmentioning
confidence: 99%