2014
DOI: 10.1109/tpwrd.2013.2279172
|View full text |Cite
|
Sign up to set email alerts
|

A PMU Placement Scheme Ensuring Real-Time Monitoring of Critical Buses of the Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
37
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
3
3
1

Relationship

1
6

Authors

Journals

citations
Cited by 64 publications
(37 citation statements)
references
References 23 publications
0
37
0
Order By: Relevance
“…The results obtained for this scenario are summarized in Table 3. The table compares the results obtained using the proposed approach with the one developed in [14]. From the table it is clear that the GOSC algorithm is able to address practical constraints associated with OPP at a lower total cost.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…The results obtained for this scenario are summarized in Table 3. The table compares the results obtained using the proposed approach with the one developed in [14]. From the table it is clear that the GOSC algorithm is able to address practical constraints associated with OPP at a lower total cost.…”
Section: Resultsmentioning
confidence: 99%
“…[14] accounting for measurement channel limitations. The results obtained indicate that the GOSC algorithm developed in this paper provides a cost-optimal solution while simultaneously addressing a variety of practical constraints.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Utilizing the concept of depth of unobservability and critical buses a PMU placement scheme has been reported in [84], which also provide real-time monitoring of key buses of the power system network. In this work high voltage buses and high connectivity buses were treated as critical buses.…”
Section: Optimal Placement Of Pmus For Online Voltage Stability mentioning
confidence: 99%
“…NUMBER OF PMUs AT DIFFERENT DEPTH OF UNOBSERVABILITY WHEN HIGH VOLTAGE AND HIGHCONNECTIVITY BUSES ARE CONSIDERED CRITICAL[84] …”
mentioning
confidence: 99%