Pragmatic approach for multistage phasor measurement unit placement: a case study of the Danish power system and inputs from practical experience

Abstract: Summary Effective phasor measurement unit (PMU) placement is a key to the implementation of efficient and economically feasible wide area measurement systems in modern power systems. This paper proposes a pragmatic approach for cost‐effective stage‐wise deployment of PMUs while considering realistic constraints. Inspired from a real world experience, the proposed approach optimally allocates PMU placement in a stage‐wise manner. The proposed approach also considers large‐scale wind integration for effective gr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 46 publications
0
4
0
Order By: Relevance
“…The current power transmission protection schemes for largescale wind farms have various challenges in HV power transmission networks [9][10][11][12][13][14][15][16]. The use of synchronised PMUs installed at both sides of each transmission line based on a global positioning system (GPS) and a high-speed communication system is one of the numerous options to discriminate internal and external faults of interconnected lines.…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…The current power transmission protection schemes for largescale wind farms have various challenges in HV power transmission networks [9][10][11][12][13][14][15][16]. The use of synchronised PMUs installed at both sides of each transmission line based on a global positioning system (GPS) and a high-speed communication system is one of the numerous options to discriminate internal and external faults of interconnected lines.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The use of synchronised PMUs installed at both sides of each transmission line based on a global positioning system (GPS) and a high-speed communication system is one of the numerous options to discriminate internal and external faults of interconnected lines. Rather et al [10] proposed a pragmatic approach of PMUs to allocate PMU placement optimally for the effective grid-state monitoring of wind generation dynamics. Prakash et al [11] proposed a matrix pencil method as a filter for PMU supported distance relays to eliminate interharmonic signals in the IEEE 14-bus system, which is a series compensated line integrated with the wind energy system.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Renewable integration has been included in OPP in Rather et al A pragmatic approach was used to find a cost‐effective stage‐wise PMU placement scheme. First, the OPP scheme is derived by PSO, and then it is scheduled over different stages.…”
Section: Introductionmentioning