2018
DOI: 10.1590/s1679-45082018ed4487
|View full text |Cite
|
Sign up to set email alerts
|

einstein (São Paulo) uma forma inovadora de publicar

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
4
0
8

Year Published

2019
2019
2022
2022

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(12 citation statements)
references
References 3 publications
(3 reference statements)
0
4
0
8
Order By: Relevance
“…Time is also a key factor in increasing efficiency of operations. Thus, Yamazumi tool graphically assists in work distribution to operators of a given station based on takt time (Rother and Harris, 2002). Thus, a graph is plotted to compare operator’s cycle time, limit cycle time planned for each operation, and client takt time, which should be longer than cycle time planned to satisfy market demand (Rother and Harris, 2002).…”
Section: Lean Manufacturingmentioning
confidence: 99%
See 1 more Smart Citation
“…Time is also a key factor in increasing efficiency of operations. Thus, Yamazumi tool graphically assists in work distribution to operators of a given station based on takt time (Rother and Harris, 2002). Thus, a graph is plotted to compare operator’s cycle time, limit cycle time planned for each operation, and client takt time, which should be longer than cycle time planned to satisfy market demand (Rother and Harris, 2002).…”
Section: Lean Manufacturingmentioning
confidence: 99%
“…Thus, Yamazumi tool graphically assists in work distribution to operators of a given station based on takt time (Rother and Harris, 2002). Thus, a graph is plotted to compare operator’s cycle time, limit cycle time planned for each operation, and client takt time, which should be longer than cycle time planned to satisfy market demand (Rother and Harris, 2002). Thus, production of operations, distribution and total time for activities are balanced to man-machine time in workplaces (Shingo, 1996).…”
Section: Lean Manufacturingmentioning
confidence: 99%
“…Foi realizado o MFV para a produção de tijolos na olaria e para a construção de alvenaria em obra. A análise de desperdícios e recomendações para o mapeamento foi realizada por meio dos métodos citados por ROTHER e SHOOK [7]. Para o MFV na produção de tijolos na olaria e no recebimento desses e confecção de alvenaria em obra, foram reproduzidas a planta baixa da obra a ser realizada e o layout da FAMUL, os quais são apresentados nas figuras 1 e 2 a seguir.…”
Section: Materiais E Métodosunclassified
“…Pela análise do mapa de fluxo de valor identificam-se atrasos no processo produtivo, entendendo quais são as etapas que agregam ou retiram valor do produto. Desse modo, melhorias podem ser estudadas e propostas, sendo possível a aplicação de ferramentas para redução de desperdícios e aumento da eficiência produtiva [7].…”
Section: Introductionunclassified
“…O Mapeamento do Fluxo de Valor (MFV), do inglês Value Stream Mapping (VSM), é uma ferramenta importante para identificar tais desperdícios, sendo a base para a transformação enxuta. O objetivo do MFV é destacar as fontes de desperdício, permitindo que os gestores enxerguem de maneira adequada o fluxo de valor do processo produtivo, para que essas perdas e desperdícios possam ser reduzidos (ROTHER;SHOOK, 2003).…”
Section: Introductionunclassified