Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.
Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.