Study on Improvement of Cost Calculation Method in Construction less than One Day Workload

Abstract: Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, thi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0
1

Year Published

2015
2015
2016
2016

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 2 publications
0
1
0
1
Order By: Relevance
“…최근 건설공사의 발주에서는 건축물의 신축공사보다 기 존 건축물 및 시설물의 개량·보수·보강을 위한 공사가 점 차 증가하고 있다 [1]. 이러한 소규모 건설공사들은 국내 건 설업에서 90% 이상을 차지하는 전문건설업체들에 의해 수 행되고 있다 [2].…”
Section: 서 론 11 연구의 배경 및 목적unclassified
“…최근 건설공사의 발주에서는 건축물의 신축공사보다 기 존 건축물 및 시설물의 개량·보수·보강을 위한 공사가 점 차 증가하고 있다 [1]. 이러한 소규모 건설공사들은 국내 건 설업에서 90% 이상을 차지하는 전문건설업체들에 의해 수 행되고 있다 [2].…”
Section: 서 론 11 연구의 배경 및 목적unclassified
“…Shin et al [8] Proposal of the need for enactment and revision of the standard of estimate due to the difference between the standard of estimate and the actual amount of labor input based on the questionnaire survey for specialized construction companies.…”
mentioning
confidence: 99%