Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process

Abstract: Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 6 publications
0
2
0
Order By: Relevance
“…Risk is an umbrella term covering both the possibility of damage and the loss of opportunities [8]. Considering this definition, risk can serve as an obstacle to the attainment of a goal in any construction project [6]. Therefore, risk analysis has the goal of adjusting risk factors to be in an optimal or acceptable condition by identifying and assessing D.-W. Shin et al the risk factors in a systematic manner.…”
Section: Previous Studies On Risk Assessmentmentioning
confidence: 99%
See 1 more Smart Citation
“…Risk is an umbrella term covering both the possibility of damage and the loss of opportunities [8]. Considering this definition, risk can serve as an obstacle to the attainment of a goal in any construction project [6]. Therefore, risk analysis has the goal of adjusting risk factors to be in an optimal or acceptable condition by identifying and assessing D.-W. Shin et al the risk factors in a systematic manner.…”
Section: Previous Studies On Risk Assessmentmentioning
confidence: 99%
“…Other related studies include a cost risk analysis for construction projects using FAHP [4], and the development of a risk assessment model using AHP for overseas construction projects [5]. However, the risks inherent in a construction project were drawn from a wider perspective in the previous studies, and it is difficult to identify the specific of risks to each unit of work type [6].…”
Section: Introductionmentioning
confidence: 99%