The application of information technology in all areas represents a significant facilitation of all business processes and activities. A competitive business system is hardly imaginable without adequate information technology. Therefore, this paper evaluates the conditions for the implementation of barcode technology in a warehouse system of a company for the manufacture of brown paper. SWOT (Strengths, Weaknesses, Opportunities, Threats) matrix was formed with a total of 27 elements based on which the benefits of the implementation of barcode technology in the warehouse system need to be analysed. For this purpose, a new fuzzy PIPRECIA (PIvot Pairwise RElative Criteria Importance Assessment) method has been developed to evaluate all elements in SWOT matrix. In addition, a part of the new developed approach includes new fuzzy scales for criterion assessment that are adapted to the methodology required by the fuzzy PIPRECIA method. To determine the consistency of the method, Spearman and Pearson correlation coefficients are applied. The results obtained in this study show that weaknesses are most noticeable in the current system. By implementing barcode technology, it is possible to create opportunities defined in SWOT matrix, which, in a very efficient way, allow elimination of the current weaknesses of the system.
Sustainable development is one of the most important preconditions for preserving resources and balanced functioning of a complete supply chain in different areas. Taking into account the complexity of sustainable development and a supply chain, different decisions have to be made day-to-day, requiring the consideration of different parameters. One of the most important decisions in a sustainable supply chain is the selection of a sustainable supplier and, often the applied methodology is multi-criteria decision-making (MCDM). In this paper, a new hybrid MCDM model for evaluating and selecting suppliers in a sustainable supply chain for a construction company has been developed. The evaluation and selection of suppliers have been carried out on the basis of 21 criteria that belong to all aspects of sustainability. The determination of the weight values of criteria has been performed applying the full consistency method (FUCOM), while a new rough complex proportional assessment (COPRAS) method has been developed to evaluate the alternatives. The rough Dombi aggregator has been used for averaging in group decision-making while evaluating the significance of criteria and assessing the alternatives. The obtained results have been checked and confirmed using a sensitivity analysis that implies a four-phase procedure. In the first phase, the change of criteria weight was performed, while, in the second phase, rough additive ratio assessment (ARAS), rough weighted aggregated sum product assessment (WASPAS), rough simple additive weighting (SAW), and rough multi-attributive border approximation area comparison (MABAC) have been applied. The third phase involves changing the parameter ρ in the modeling of rough Dombi aggregator, and the fourth phase includes the calculation of Spearman’s correlation coefficient (SCC) that shows a high correlation of ranks.
The decision-making trial and evaluation laboratory (DEMATEL) method is one of the most significant multi-criteria techniques for defining the relationships among criteria and for defining the weight coefficients of criteria. Since multi-criteria models are very often used in management and decision-making under conditions of uncertainty, the fuzzy DEMATEL model has been extended in this paper by D numbers (fuzzy DEMATEL-D). The aim of this research was to develop a multi-criteria methodology that enables the objective processing of fuzzy linguistic information in the pairwise comparison of criteria. This aim was achieved through the development of the fuzzy DEMATEL-D method. Combining D numbers with trapezoidal fuzzy linguistic variables (LVs) allows for the additional processing of uncertainties and ambiguities that exist in experts’ preferences when comparing criteria with each other. In addition, the fuzzy DEMATEL-D methodology has a unique reasoning algorithm that allows for the rational processing of uncertainties when using fuzzy linguistic expressions for pairwise comparisons of criteria. The fuzzy DEMATEL-D methodology provides an original uncertainty management framework that is rational and concise. In order to illustrate the effectiveness of the proposed methodology, a case study with the application of the proposed multi-criteria methodology is presented.
The quality of output or decision-making depends on high-quality input data, their adequate evaluation, the application of adequate approaches, and accurate calculation. In this paper, an objective criticism of applying the fuzzy SWARA (step-wise weight assessment ratio analysis) method based on the Chang TFN (triangular fuzzy number) scale is performed. Through research, it has been noticed that a large number of studies use this approach and, as an epilogue, there are wrong decisions based on inconsistent values in relation to the initial assessment of decision-makers (DMs). Seven representative studies (logistics, construction industry, financial performance management, and supply chain) with different parameter structures and decision matrix sizes have been singled out. The main hypothesis has been set, which implies that the application of this approach leads to wrong decisions because the weight values of the criteria are incorrect. A comparative analysis with the improved fuzzy SWARA (IMF SWARA) method has been created and a number of negative conclusions has been reached on using the fuzzy SWARA method and the Chang scale: Primarily, that using such an approach is impossible for two or more criteria to have equal value, that allocating TFN (1,1,1) leads to criteria values that are inconsistent with expert evaluation, that the last-ranked criteria in the fuzzy SWARA method have no influential value on the ranking of alternatives, that there is a great gap between the most significant and last-ranked criteria, and that the most significant criterion has a huge impact on the evaluation of alternative solutions and decision making. As a general conclusion, it is given that this approach is not adequate for application in problems of multi-criteria decision making because it produces inadequate management of processes and activities in various spheres.
Mega-projects, particularly for the development of infrastructure, are being undertaken increasingly in many developing countries. Mega-projects are highly complex and involve significant construction activities. However, mega-projects in Africa face critical challenges of delay and cost overruns because of their nature and the complexities involved. Therefore, using the context of mega-projects in South Africa and stakeholders’ perceptions, the factors that influence construction, and strategies that would alleviate the challenges and improve construction management at sites were examined in this study. Factor analysis and ordinal regression modelling were used to analyse data obtained from a survey conducted among stakeholders. Findings suggested that five principal components and associated factors, including stakeholders, plant and machinery, productivity, workforce and materials, significantly affect construction during mega-projects. Further, eight strategies that are aligned to stakeholder engagement, plants and machinery, productivity, human resources and materials are likely to improve construction management at sites of mega-projects in South Africa. The four most important strategies include making the availability of competent personnel for plant and machinery operation and maintenance, effective supervision and monitoring, the adoption of appropriate stakeholder engagement methods and ensuring transparent and effective engagement, and the implementation of an advanced and effective communication system. Further strategies, such as the identification of stakeholders and common goals and procurement and use of advanced and quality plant and machinery, including the use of robotics and automation, could improve construction at sites. Similarly, strategies such as ensuring availability of adequate and quality material, and management of the site for effective accessibility and operation, although likely to have lesser influence, could also improve construction at sites of mega-projects.
The construction industry, as one of the most complex sectors, depends on using wasted and recycled materials, timely decision-making, and adequate execution of all activities in supply chains. This paper presents tests of mixtures for cold in-place recycling where existing material is used. In this research, we used cement and bitumen emulsion as well as fly ash, zeolite, slag, and Bakelite. A total of seven mixtures were tested in order to increase sustainability. It was tested the indirect tensile strength and dynamic modulus of elasticity after seven and 28 days for dry specimens, after 28 days for water-saturated specimens and for specimens exposed to frost. After completing the tests using the MEREC (MEthod based on the Removal Effects of Criteria) and CoCoSo (Combined Compromise Solution) multi-criteria model, mixtures were evaluated and ranked in terms of mechanical properties, price, and environmental protection. Considering the ranking of mixtures using the CoCoSo method, the highest quality mixtures, for most combinations of weight factors, are mixtures with slag, mixtures with fly ash, and mixtures with 2% of cement and 2% of bitumen emulsion. Sensitivity analysis was also performed with new simulated values of the criteria in order to determine the individual influence of the criteria on the ranking of mixtures. The conclusions are as follows: the use of bitumen emulsion, cement, waste materials, and other materials in cold recycling would reduce the cost of recycling pavement structures, increase environmental protection, while the mechanical properties of the pavement structures are within acceptable limits.
One of the most common tools for achieving optimization and adequate production process management is linear programming (LP) in various forms. However, there are specific cases of the application of linear programming when production optimization implies several potential solutions instead of one. Exactly such a problem is solved in this paper, which integrates linear programming and a Multi-Criteria Decision-Making (MCDM) model. First, linear programming was applied to optimize production and several potential solutions lying on the line segment AB were obtained. A list of criteria was created and evaluated using the Improved Fuzzy Stepwise Weight Assessment Ratio Analysis (IMF SWARA). To obtain the final solution, a novel Rough compromise ranking of alternatives from distance to ideal solution (R-CRADIS) method was developed and verified through comparative analysis. The results show that the integration of linear programming and a Fuzzy-Rough MCDM model can be an exceptional solution for solving specific optimization problems.
Infrastructure project delivery, specifically the delivery of water infrastructure projects, is a serious challenge in South Africa. Therefore, using the study context of water utility agencies in South Africa, the objective of this study was to examine the challenges that emanate from poor delivery and factors that cause poor delivery of water infrastructure projects in South Africa. Furthermore, it evaluated the various strategies that could enable improvement in water infrastructure project delivery. A survey research method constituting data obtained on the perceptions of relevant stakeholders and ordinal regression modeling were used for conducting the study. Findings suggest that delay in project completion, cost overruns, poor quality of work, poor fund utilization, and poor service delivery are the major challenges of the poor delivery of projects. The major factors that cause such challenges are linked to four aspects of the infrastructure projects such as project management, organization and management, construction and construction management, and sociopolitical. Six-pronged strategic measures, which include capacity building, the appointment of competent and skilled professionals, structuring review and monitoring processes, enhancing collaboration and communication among stakeholders, enabling accountability and transparency, and adopting participative leadership, can assist efficient water infrastructure project delivery in South Africa.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.