In construction project work, inconsistencies sometimes occur in some or even all phases of the work. The inconsistency (variation order) has significant implications on the success of the project which can result in the work not being completed on time or even triggering cost overruns. The purpose of this study is to analyze the factors that cause the order of variation and to determine the effect of variations in the order of development projects in the Education Building in Gorontalo Province. This type of research is a descriptive study in which the method of analysis using SPSS program tools and analyzed by the Likert Scale method, the validity and reliability test, and the index of importance. The results of the analysis, there are six factors causing variation order: design changes, mismatches between drawings and field conditions, the addition of scope of work, unclear planning and specifications, changes in material specifications, changes in work methods. The impact caused by the addition of work volume and additional work time.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.