Abstract. The rational utilization of waste rubber tire is essential for the environmental protection. Utilizing rubber particles to modify asphalt can not only improve asphalt performance, but also help the recycling of waste materials. Considering the effect of different preparation process parameters on the performance of rubber modified asphalt, this paper analyzes the effects of the shear temperature, shear time and shear rate on the performance of rubber modified asphalt, and provided a reference for its preparation.
IntroductionThe increasing traffic load and the more frequent extreme weather conditions put higher requirements on the performance of the road construction materials. In recent years, road damage phenomena such as pavement rut, bleeding and bulling have happened very frequent and become increasingly serious. Therefore, how to improve the performance of asphalt mixture and prolong the service life of pavement becomes an important research direction of the road building materials [1].The amount of waste rubber tire has been increasing along with the number of cars growing in China. Relevant data show that there are new 250 million waste rubber tires totaling 520 tons in 2010. The existing recycling level of waste rubber tire is low and large numbers of tires are disposed with fire, which has aggravated the environmental pollution. In fact, waste can be turned into treasure as the effective components contained in waste rubber tire can be used for asphalt modification. Studies on rubber modified asphalt have attracted broad attention of scholars all over the world [1,2].Waste rubber tire is an ideal asphalt modifier, including natural rubber, synthetic rubber, carbon black and other ingredients. It's shown in some research papers that adding rubber particles into asphalt can significantly improve the performance of asphalt and its mixture, such as enhancing durability of pavement, increasing the toughness and elasticity recovery of asphalt, improving the aging resistance and anti-rutting ability, and reducing the pavement noise etc. [3,4].The process of rubber modified asphalt mainly consists of dry and wet processes, and the wet process has been widely applied in real-world engineering. Considering the effect of different preparation process parameters on the performance of rubber modified asphalt, this paper analyzed the effects of the shear temperature, shear time and shear rate on the performance of the rubber modified asphalt, which provided a reference for its preparation [5][6][7][8][9][10].