All Days 2012
DOI: 10.2118/158026-ms
|View full text |Cite
|
Sign up to set email alerts
|

Using Dynamic Simulations to Predict and Optimize Cleanup Operation of Horizontal Gas Wells

Abstract: Cleanup operations of gas wells are conducted when the well is kicked off and tested the first time. During cleanup, the drilling and completion fluids come out of the well along with the produced gas and associated liquids. The phenomena is transient in nature and minimum gas rate and time required for cleanup are key questions to be answered before embarking on the cleanup and subsequent well test operation. The knowledge of minimum gas rate and time required for cleanup can assist the engineer in deciding t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2016
2016
2018
2018

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
references
References 4 publications
0
0
0
Order By: Relevance