2019
DOI: 10.25018/0236-1493-2019-05-0-34-43
|View full text |Cite
|
Sign up to set email alerts
|

Underground mine planning with regard to preparedness of mineral reserves

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
11
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 15 publications
(12 citation statements)
references
References 0 publications
0
11
0
Order By: Relevance
“…In these conditions, the cost of reclamation increases, because of noncompliance with the obligations of public authorities to ensure the state of the postindustrial territory. The lack of rational planning and the current reclamation at a stage of mining works is another reason [25]. It should be noted that filling the mined-out space with water provides opportunities for the use of disturbed lands for the recreational purposes.…”
Section: Methodological Approach To the Creation Of A Recreation Zonementioning
confidence: 99%
“…In these conditions, the cost of reclamation increases, because of noncompliance with the obligations of public authorities to ensure the state of the postindustrial territory. The lack of rational planning and the current reclamation at a stage of mining works is another reason [25]. It should be noted that filling the mined-out space with water provides opportunities for the use of disturbed lands for the recreational purposes.…”
Section: Methodological Approach To the Creation Of A Recreation Zonementioning
confidence: 99%
“…It is assumed that the ring structures, which are associated with many mineral deposits, are mostly the result of the bombardment of the Earth by meteorites, asteroids and comets [27]. That is, these are structures of a cosmogenic, impact nature, representing huge volumes of brecciated and fractured rocks, which are natural pathways and structural traps for the penetration of ore-bearing mantle fluids, as well as liquid and gaseous hydrocarbons [9]- [13], [19], [28].…”
Section: Introductionmentioning
confidence: 99%
“…Each problem solving has its own application area. Failure in the design of mining operation schedule will affect prime cost of output (Petlovanyi, Lozynskyi, Saik, & Sai, 2018) as well infrastructure of the region where the enterprise is located (Kalybekov, Rysbekov, Toktarov, & Otarbaev, 2019;Kalybekov, Sandibekov, Rysbekov, & Zhakypbek, 2019). Hence, it is strategic problem being solved by means of construction of production scenarios, their intertemporal and spatial comparison, and selection of a sole optimum (Pivnyak, Dychkovskyi, Smirnov, & Cherednichenko, 2013;Bondarenko, Kovalevs'ka, & Ganushevych, 2014).…”
Section: Introductionmentioning
confidence: 99%