2019
DOI: 10.33271/mining13.04.053
|View full text |Cite
|
Sign up to set email alerts
|

Models and methods to make decisions while mining production scheduling

Abstract: Purpose is to develop a new approach to the design of mining operations basing upon models and methods of decision making.Methods. The paper has applied a complex approach involving approaches of decision-making theory. Analysis of the pro-duction development scenarios is proposed for strategic activity planning; criteria to make decisions under the uncertainty conditions as well as decision-making trees for day-to-day management are proposed to determine balanced production level.Findings. It has been identif… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
14
0
6

Year Published

2020
2020
2023
2023

Publication Types

Select...
8

Relationship

2
6

Authors

Journals

citations
Cited by 22 publications
(20 citation statements)
references
References 28 publications
0
14
0
6
Order By: Relevance
“…Issues of dump formation have been considered in various scientific papers [1][2][3][4][5][6][7][8]. The volume of the overburden rocks extraction of and their storage in the external dump directly depends on the productivity of the open mine where minerals are extracted [9][10][11][12][13][14][15][16][17]. The placement of overburden rocks and the productivity of open mine equipment is an important task that affects the sequence of dump development and the stability of slopes.…”
Section: Analysis Of Studiesmentioning
confidence: 99%
“…Issues of dump formation have been considered in various scientific papers [1][2][3][4][5][6][7][8]. The volume of the overburden rocks extraction of and their storage in the external dump directly depends on the productivity of the open mine where minerals are extracted [9][10][11][12][13][14][15][16][17]. The placement of overburden rocks and the productivity of open mine equipment is an important task that affects the sequence of dump development and the stability of slopes.…”
Section: Analysis Of Studiesmentioning
confidence: 99%
“…However, it is necessary from this variety to choose the most preferable in terms of its visualization possibility, as well as the formation of a "bank of design decisions". In our opinion, graphs and network models can be used for it [22]. There are a few advantages -visualization, simplicity, the possibility of implementation on all platforms, versatility, the ability to form a "bank of design decisions".…”
Section: Introductionmentioning
confidence: 99%
“…Ці причини викликані не тільки старінням основних фондів, незадовільною інфраструктурою, низьким ступенем механізації праці, але і неповним використанням сировини, яка є результатом видобутку. Згідно досліджень [1,2] продуктивними потоками вугільних шахт є вугілля, метан, порода, вода, проте, наразі у якості основної сировини, яка є результатом виробничо-господарчої діяльності є лише вугілля, а іншим продуктивним потокам, наразі приділяється недостатня увага. Зупинимось на основних проблемах, які супроводжують видобуток вугілля підземним способом, це сформує актуальність, науково-практичне значення роботи:…”
unclassified