2020
DOI: 10.1016/j.autcon.2020.103137
|View full text |Cite
|
Sign up to set email alerts
|

UAV-based 3D reconstruction for hoist site mapping and layout planning in petrochemical construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
26
0
1

Year Published

2020
2020
2022
2022

Publication Types

Select...
6
4

Relationship

0
10

Authors

Journals

citations
Cited by 59 publications
(35 citation statements)
references
References 38 publications
0
26
0
1
Order By: Relevance
“…The first step is an on-the-spot investigation in the observed area, determining the observation range and flight height, according to the observed building height, ground resolution etc. The second step is to assemble a UAV and prepare the flight plan on a sunny day, including camera exposure parameters and route parameters [39]. The third step is to conduct oblique photogrammetry at a fixed-point, based on the predetermined route.…”
Section: Acquisition Of 3d Modelsmentioning
confidence: 99%
“…The first step is an on-the-spot investigation in the observed area, determining the observation range and flight height, according to the observed building height, ground resolution etc. The second step is to assemble a UAV and prepare the flight plan on a sunny day, including camera exposure parameters and route parameters [39]. The third step is to conduct oblique photogrammetry at a fixed-point, based on the predetermined route.…”
Section: Acquisition Of 3d Modelsmentioning
confidence: 99%
“…With the deployment of UASs, site planners have become able to collect visual information to assist them plan construction activities and provide detailed schedule, layout, and logistics-related information, particularly when integrated with augmented reality (AR) (Wen and Kang 2014). Using UAS visualizations, a very recent analysis reconstructed a petrochemical plant to improve the hoist layout planning efficiency, ultimately resulting in faster, safer, and more efficient operations on the jobsites (Jiang et al 2020a). Based on several layout plans generated using a specific algorithm, the authors recommended an optimized and weighted site plan to improve hoisting operations' safety and efficiency.…”
Section: Pre-construction Applicationsmentioning
confidence: 99%
“…3D models can be called to design the construction frame, assess the feasibility of construction, and control project risks. If the building is particularly complex in shape, it is critical to eliminate risks before construction, thereby ensuring work progress and safety [49].…”
Section: Integrating Safety Space In 3d Model Design Promotes Construction Planmentioning
confidence: 99%