2021
DOI: 10.1016/j.ijggc.2021.103263
|View full text |Cite
|
Sign up to set email alerts
|

Towards improved cost evaluation of Carbon Capture and Storage from industry

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
48
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3
2
1
1

Relationship

2
5

Authors

Journals

citations
Cited by 105 publications
(51 citation statements)
references
References 44 publications
0
48
0
Order By: Relevance
“…25,34 For the electricity consumed, we also accounted for the specific direct emissions of 38 kg CO 2 per MWh based on the assumption that the electricity consumed by the PVSA is supplied through a deeply decarbonised power system based on a fossil-based power plant with CCS and renewables. 25 As indirect CO 2 emissions associated with electricity consumption increase the CO 2 avoidance cost 35 , the premise of a deeply decarbonised power system is consistent with the search for the cost limit. Since the source of electricity generation and its characteristics depends on several parameters such as plant location and electricity mix, we conducted an optimisation study with alternative scenarios to investigate the impact on PVSA cost limits.…”
Section: Comparison With Mea Absorptionmentioning
confidence: 87%
“…25,34 For the electricity consumed, we also accounted for the specific direct emissions of 38 kg CO 2 per MWh based on the assumption that the electricity consumed by the PVSA is supplied through a deeply decarbonised power system based on a fossil-based power plant with CCS and renewables. 25 As indirect CO 2 emissions associated with electricity consumption increase the CO 2 avoidance cost 35 , the premise of a deeply decarbonised power system is consistent with the search for the cost limit. Since the source of electricity generation and its characteristics depends on several parameters such as plant location and electricity mix, we conducted an optimisation study with alternative scenarios to investigate the impact on PVSA cost limits.…”
Section: Comparison With Mea Absorptionmentioning
confidence: 87%
“…Figure 1-1 lists the additional elements of a capital cost estimate, which include pre-production costs, inventory capital, financing costs, capital cost escalations and interest on debt during construction, and other "owner's costs" that are enumerated in guideline documents for engineering-economic cost estimates (e.g., [4,6,16,19]). Readers should consult those documents for more detailed guidance on how to quantify these factors for commercial technologies.…”
Section: Other Capital Cost Factorsmentioning
confidence: 99%
“…Similarly, large centrifugal or axial fans are typically designed for 2x100% redundancy for critical motors, valves, and bypass lines [47]. 4 In these cases, redundancy is applied to mature technologies as well as to FOAK installations.…”
Section: Plant and Process Design Factorsmentioning
confidence: 99%
See 2 more Smart Citations