2010
DOI: 10.1016/j.ejor.2010.03.002
|View full text |Cite
|
Sign up to set email alerts
|

Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
11
0
2

Year Published

2013
2013
2022
2022

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 20 publications
(13 citation statements)
references
References 28 publications
0
11
0
2
Order By: Relevance
“…In another study by Drobouchevitch et al [8], a cyclic sequence of robot movements was determined to minimize the long-run average time and maximize throughput.…”
Section: Literature Surveymentioning
confidence: 99%
See 1 more Smart Citation
“…In another study by Drobouchevitch et al [8], a cyclic sequence of robot movements was determined to minimize the long-run average time and maximize throughput.…”
Section: Literature Surveymentioning
confidence: 99%
“…A major application of robots in manufacturing involves the loading and unloading of production machines in manufacturing cells. A robot in such a cell performs repeated sequences of pick-up, movement, loading, unloading and dropping operations, and thus, the performance of the cell strongly depends on the sequence of robotic activities and on the sequence of the different parts produced in the cell [4][5][6][7][8].…”
Section: Introductionmentioning
confidence: 99%
“…FMC를 대상으로 하는 연구들의 많은 부분은 일정계 획(Scheduling)에 대한 연구들인데 복수의 장비와 물류를 담당하는 로봇이 원형으로 구성되었을 때 일정계획을 수 립하는 문제와 [4,10] 직선형 FMS의 일정계획을 다룬 연구 들이 [3,5] 발표된 바 있다. Lu와 Wiens [6] 은 시뮬레이션을 이용하여 U형 FMC의 효과에 대해 검증한 논문을 발표하 였으며, Savsar와 Aldaihani [8] 는 FMC를 신뢰성 측면에 서 분석한 연구결과를 발표하였다.…”
Section: 서 론unclassified
“…The buffer allocation problem is a well-known problem and is widely discussed in literature [16][17][18][19][20]26]. However, specifically on buffer dimensioning, the focus in literature concerns rigid production systems [16,17,26] or generic automated flexible production systems [18].…”
Section: Introduction and Literature Reviewmentioning
confidence: 99%
“…However, specifically on buffer dimensioning, the focus in literature concerns rigid production systems [16,17,26] or generic automated flexible production systems [18]. These approaches, such as those by Senanayake et al [18] and Drobouchevitch et al [26], cannot be used to modelize and analyze robotized flexible production systems in applications where industrial robots must interact with a feeding system and a working station.…”
Section: Introduction and Literature Reviewmentioning
confidence: 99%