2015
DOI: 10.2749/222137815818359582
|View full text |Cite
|
Sign up to set email alerts
|

Temburong Bridge, Brunei

Abstract: <p>Temburong district has been physically isolated from the rest of Brunei which has hindered the economic growth of the district. A sea-crossing is planned to link the district to Brunei-Muara. A feasibility study was carried out between 2010 and 2012 to establish the alignment and preliminary design of the link, assess the project impacts and analyse the costs and benefits.</p>

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
3
1
1

Relationship

1
4

Authors

Journals

citations
Cited by 12 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In March 2012, Arup completed the Feasibility Study [1] for the road and bridge link between Brunei-Muara District and Temburong District in Brunei. A Preliminary Impact Assessment (PEIA) was carried out at the Feasibility Stage the purpose of which was to:…”
Section: Introductionmentioning
confidence: 99%
“…In March 2012, Arup completed the Feasibility Study [1] for the road and bridge link between Brunei-Muara District and Temburong District in Brunei. A Preliminary Impact Assessment (PEIA) was carried out at the Feasibility Stage the purpose of which was to:…”
Section: Introductionmentioning
confidence: 99%