2021
DOI: 10.33536/jiem.v6i2.942
|View full text |Cite
|
Sign up to set email alerts
|

Supply Chain Risk Analysis in Kub – Ik Mataram Macoa With House of Risk (Hor)

Abstract: (KUB - IK ) Mataram  Macoa is a cocoa industry . The cocoa industry can produce chocolate with a cocoa material capacity of 87 kg per month or 1.0444 tons per year. Based on data from the Polewali Mandar Regency Statistics Agency, in 2018 the chocolate industry has a prospect that is still less proven with the data from BPS Polewali Mandar Regency, there is only 1 group of cocoa industry centers and the number of business units is 1 unit (BPS Polewali Mandar Regency, 2018).The company does not currently have a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
3
0
1

Year Published

2022
2022
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 4 publications
0
3
0
1
Order By: Relevance
“…Dengan adanya persediaan, maka perusahaan dapat memenuhi permintaan pelanggan dengan tepat waktu (Rahardjo, 2017). Pada pengelolaan gudang tidak terlepas dari risikorisiko yang akan merugikan perusahaan, dimana dampak dari risiko akan merugikan perusahaan dari segi materi, waktu dan biaya (Herdianzah, 2020;Muthmainnah et al, 2021;Padhil et al, 2021).…”
Section: Pendahuluanunclassified
“…Dengan adanya persediaan, maka perusahaan dapat memenuhi permintaan pelanggan dengan tepat waktu (Rahardjo, 2017). Pada pengelolaan gudang tidak terlepas dari risikorisiko yang akan merugikan perusahaan, dimana dampak dari risiko akan merugikan perusahaan dari segi materi, waktu dan biaya (Herdianzah, 2020;Muthmainnah et al, 2021;Padhil et al, 2021).…”
Section: Pendahuluanunclassified
“…the application of the Min-Max method from the research results of (Goldiantero et al, 2020), namely: "if the supply has exceeded the minimum brick and approaches the safety stock limit, it is necessary to do a Re Order, meaning that it has reached the re order limit level, the maximum limit is the limit of the company's or management's willingness to invest their money in the form of raw material inventory. This study uses the min-max method because the situation is fluctuating, which means that consumer demand and raw material needs are uncertain (Padhil et al, 2021).…”
Section: Introductionmentioning
confidence: 99%
“…CV. Sinar Jaya Maros produces perforated concrete roster manually without any assistance from a printing machine [9] [10]. As a result, the manufacture of perforated concrete roster products is carried out based on estimates from workers who do not have the right composition and process.…”
Section: Introductionmentioning
confidence: 99%