Stochastic analyses for managing risk of delay in Duri oil construction projects, Indonesia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 18 publications
0
6
0
Order By: Relevance
“…Comparison of the results of the study with the previous research indicated that the owner's financial problems were found to be the most critical causes of delay in the oil and gas construction industry of the countries such as Iran and India (Fallahnejad, 2013;Prasad et al, 2019). As stated by Zakeri et al (1996) and Sandhyavitri (2019), changes in design and specifications are one of the significant causes of delays in oil construction projects in Iran and Indonesia. Moreover, our findings are supported by prior research conducted by Zakeri et al (1996) and Ravand and Salai (2011) that low efficiency of equipment and low productivity of labor are critical delay factors in construction projects in Iran.…”
Section: Discussionmentioning
confidence: 97%
“…Comparison of the results of the study with the previous research indicated that the owner's financial problems were found to be the most critical causes of delay in the oil and gas construction industry of the countries such as Iran and India (Fallahnejad, 2013;Prasad et al, 2019). As stated by Zakeri et al (1996) and Sandhyavitri (2019), changes in design and specifications are one of the significant causes of delays in oil construction projects in Iran and Indonesia. Moreover, our findings are supported by prior research conducted by Zakeri et al (1996) and Ravand and Salai (2011) that low efficiency of equipment and low productivity of labor are critical delay factors in construction projects in Iran.…”
Section: Discussionmentioning
confidence: 97%
“…Based on the literature review, it was identi ed that there were approximately 30 to 49 risk factors inherent in the type of oil project [6,7,27].…”
Section: Applied Materials and Technologymentioning
confidence: 99%
“…Over the years, various risk factors of project delays in the construction industry have been reviewed from many articles such as [1][2][3][4][5][6][7].…”
Section: Introductionmentioning
confidence: 99%