2013 3rd Eastern European Regional Conference on the Engineering of Computer Based Systems 2013
DOI: 10.1109/ecbs-eerc.2013.28
|View full text |Cite
|
Sign up to set email alerts
|

Selection and Prioritization of Test Cases by Combining White-Box and Black-Box Testing Methods

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
2
0
2

Year Published

2014
2014
2023
2023

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 6 publications
0
2
0
2
Order By: Relevance
“…Prototipe ini sudah melewati pengujian whitebox untuk menghindari kemungkinan error code. Selain itu, prototipe ini juga sudah melewati pengujian metode blackbox untuk memastikan prototipe berjalan sesuai dengan fungsionalitasnya dan sesuai dengan kebutuhan pengguna (Kukolj et al, 2013).…”
Section: Pengujian Dan Evaluasi Prototipeunclassified
“…Prototipe ini sudah melewati pengujian whitebox untuk menghindari kemungkinan error code. Selain itu, prototipe ini juga sudah melewati pengujian metode blackbox untuk memastikan prototipe berjalan sesuai dengan fungsionalitasnya dan sesuai dengan kebutuhan pengguna (Kukolj et al, 2013).…”
Section: Pengujian Dan Evaluasi Prototipeunclassified
“…During the integration of different layers, if the interactions between components are not fully tested, unexpected results may occur and lead to more critical problems. Additionally, the temporal behavior is another important functional behavior in the real-time systems [7], [8]. For real-time embedded system, all requests involved must be handled and completed within the allocated period after the event has been triggered.…”
Section: A Embedded System Testingmentioning
confidence: 99%
“…One of the goals of the CIRENE project [19] was to define a general testing methodology for embedded systems that copes with the above mentioned specialities and whose parts can be implemented on specific systems. The methodology combines black-box tests responsible for the quality assessment of the system under test and white-box tests responsible for the quality assessment of the tests themselves.…”
Section: The Cirene Projectmentioning
confidence: 99%