Scheduling design of Jakarta-Cikampek II elevated toll road project (P.186 – P.187)

Abstract: The key to achieving effective and efficient development goals is by increasing the quality of construction management by collecting up-to-date data about the project's resources, mainly about productivity. In this research space, productivity will be discussed, including human resources and their management. The case study is the project of Jakarta-Cikampek II Elevated Toll Road. This project was a developing project to improve the capacity of the existing Jakarta-Cikampek toll road. This elevated structure w… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
1
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 7 publications
0
1
0
1
Order By: Relevance
“…The number of respondents was 200 representing 42 subdistricts. Data analysis included identification, categorization and interpretation, through the results of community perceptions as conclusions from responses to the questions asked [18]. survey which was conducted on 3 -10 July 2023.…”
Section: Methodsmentioning
confidence: 99%
“…The number of respondents was 200 representing 42 subdistricts. Data analysis included identification, categorization and interpretation, through the results of community perceptions as conclusions from responses to the questions asked [18]. survey which was conducted on 3 -10 July 2023.…”
Section: Methodsmentioning
confidence: 99%
“…EET adalah peristiwa paling awal atau waktu tercepat dari suatu kegiatan, sedangkan LET adalah peristiwa paling akhir atau waktu paling lambat dari suatu kegiatan. Metode CPM membantu mendapatkan lintasan kritis [5] yaitu lintasan yang menghubungkan kegiatan-kegiatan kritis, atau dengan kata lain lintasan kritis adalah lintasan kegiatan yang tidak boleh terlambat ataupun mengalami penundaan pelaksanaan karena keterlambatan tersebut akan menyebabkan keterlambatan pada waktu total penyelesaian proyek.…”
Section: Metode Cpm (Critical Path Method)unclassified
“…Erection Girder work is included in work that is on the critical path of toll road construction projects, this work requires handling starting from the diversion of traffic flow, the use of heavy equipment as support such as CRANE 180T for service lifting equipment and CRANE 250T for main lifting equipment and Erection Box Girder Length 50 meters (Khalim et al, 2020). Moreover, the projects currently being carried out in the conditions of the Covid-19 pandemic, of course, there are other things that are very important and also influential in activities in all aspects.…”
Section: Introductionmentioning
confidence: 99%