Risk Inclusion in the Reserve Price Estimation for Toll Road Concession Award

Abstract: Investors' risks in toll road concession award are related mainly to land acquisition; toll tariff, and tender process. Although the first of two are dominant risks, this study is focused on the risks associated with tender process. The reserve price, as a comparator for investors, bids has been criticized by investors, as it does not include proper cost of risks. There is a need to develop a more equitable reserve price that considers the risks, both at the project and at the business/corporate level. These r… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 1 publication
0
5
0
Order By: Relevance
“…(1) Inventory of activity (2) The process of inventory of these activities is the breakdown of a project into several major components of the project (3) Dependency Logic (4) Solving the project into work packages should consider the sequence of work to be performed (5) Estimated Time (6) This time estimate is the period required to complete each activity Several factors determine the length of activity, job volume, labor, weather, project location, time estimating procedure. The terms used in the network diagram are as follows [7], [8]:…”
Section: Excavatormentioning
confidence: 99%
See 1 more Smart Citation
“…(1) Inventory of activity (2) The process of inventory of these activities is the breakdown of a project into several major components of the project (3) Dependency Logic (4) Solving the project into work packages should consider the sequence of work to be performed (5) Estimated Time (6) This time estimate is the period required to complete each activity Several factors determine the length of activity, job volume, labor, weather, project location, time estimating procedure. The terms used in the network diagram are as follows [7], [8]:…”
Section: Excavatormentioning
confidence: 99%
“…Management is coordinating work activities so that the work is completed efficiently and effectively and through other researchers [1], [2]. The research aims to plan a construction management concept within the scope of effective and efficient scheduling to minimize disruption to the currently active toll road.…”
Section: Introductionmentioning
confidence: 99%
“…Recommendations: which one to be included in the HPSPJT and which one not to be included in the improvement of contract clauses. A study to identify risks in PPP toll road in Indonesia has been described [8]. These risks study was based on previous studies as in [9], [10], and [11].…”
Section: Interviews With Investors About Risk Mitigation Thatmentioning
confidence: 99%
“…This ensures better results of projects subject to development of locality and public well-being. As a concluding thought, owing to their magnitude, highway infrastructure projects are threatened by emerging risks and their cost needs to be worked out in concession awards (Wirahadikusumah et al , 2014).…”
Section: Decision-making In Ppp Concessionmentioning
confidence: 99%