2019
DOI: 10.1016/j.cie.2019.01.046
|View full text |Cite
|
Sign up to set email alerts
|

Reliability-oriented design of integrated model of preventive maintenance and quality control policy with time-between-events control chart

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
15
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 52 publications
(15 citation statements)
references
References 37 publications
0
15
0
Order By: Relevance
“…More recently, [13] integrated χ 2 control chart and maintenance planning for a two-stage dependent process. Reference [14] proposed a reliability-oriented integration model for joint PM and SPC with time-between-events (TBE) control chart. Reference [15] also established a condition-based maintenance model for service facility by integrating a TBE control chart and maintenance policy.…”
Section: Literature Review Notationsmentioning
confidence: 99%
“…More recently, [13] integrated χ 2 control chart and maintenance planning for a two-stage dependent process. Reference [14] proposed a reliability-oriented integration model for joint PM and SPC with time-between-events (TBE) control chart. Reference [15] also established a condition-based maintenance model for service facility by integrating a TBE control chart and maintenance policy.…”
Section: Literature Review Notationsmentioning
confidence: 99%
“…For example, He et al [18], Zhang and Cheng [19], and Ramadan [20] improved different control charts based on different practical demands. He et al [21,22] proposed, respectively, the risk analysis method and the optimization model for quality control of the proces by combing the SPC method. After years of development, the SPC method has become a mature tool in modern industrial quality control.…”
Section: Introductionmentioning
confidence: 99%
“…e integrated model was further developed by Yin et al [14] considering ten scenarios of the delayed monitoring process. From the perspective of reliability improvement, some SPC charts were also established to monitor the feature of time-between-events (TBE) assuming that TBE followed the gamma distribution [15], the normal distribution [16], the exponential distribution [17], the Weibull distribution [18], etc.…”
Section: Introductionmentioning
confidence: 99%