Dynamic Risk Analysis in Metro Construction Using Statistical Process Control

Abstract: Metro construction is normally carried out in complex engineering geological environment, so it can generate various risk events. In the process of metro construction, a scientific risk dynamic analysis is indispensable to reduce and control risks. In order to analyze the risk in metro construction more scientifically and reasonably, in this study, a new risk dynamic analysis method for metro construction is proposed using statistical process control. The method can analyse the risk level according to the proc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2022
2022
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 22 publications
0
1
0
1
Order By: Relevance
“…For construction projects, some methods can be used to reduce risks, such as dynamic analysis of risk level and characteristics based on statistical process [22], risk assessment based on schedule performance index (SPI) [23], and using the building information model (BIM) to mitigate risks [18]. e models for analyzing risk sources and risk factors include BP (back propagation) neural network method [24], analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method [25], system dynamics [17], fault tree analysis (FTA), event tree analysis (ETA), and Bayesian network (BN) [26].…”
Section: Literature Reviewmentioning
confidence: 99%
“…For construction projects, some methods can be used to reduce risks, such as dynamic analysis of risk level and characteristics based on statistical process [22], risk assessment based on schedule performance index (SPI) [23], and using the building information model (BIM) to mitigate risks [18]. e models for analyzing risk sources and risk factors include BP (back propagation) neural network method [24], analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method [25], system dynamics [17], fault tree analysis (FTA), event tree analysis (ETA), and Bayesian network (BN) [26].…”
Section: Literature Reviewmentioning
confidence: 99%
“…The complicated engineering geological context that metro development typically takes place in can lead to a number of risk events. By taking the appropriate mitigation measures during the design and planning phases, risks in a building project can be minimized or transferred from one partner to another Hence research-based risk analysis is required during the metro construction process to reduce and control risks (3)(4)(5)(6)(7) . Literature on possible risk and various analysis tools available will assist this paper (4) .…”
Section: Introductionmentioning
confidence: 99%
“…Untuk evolusi proses sendiri variasi data yang sesuai terdiri dari dua bagian yakni yang pertama adalah gelombang acak yang disebabkan oleh faktor acak, dan yang kedua adalah variasi tren yang disebabkan oleh faktor sistematis. Metode ini memiliki tujuan untuk mengidentifikasi karakteristik variasi serta analisis proses [8].…”
unclassified