2015
DOI: 10.1007/s11771-015-2908-9
|View full text |Cite
|
Sign up to set email alerts
|

Regression model for daily passenger volume of high-speed railway line under capacity constraint

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 19 publications
0
4
0
Order By: Relevance
“…The point on the tread surface, which is 70 mm from the inside of the wheel, is defined as the base point, and the circle formed by the base point along the circumference of the wheel is called the rolling circle [20]. At present, the diameter of the rolling circle is manually measured using a wheel diameter gauge on the spot, and the tread wear is obtained by subtracting the current wheel diameter from the wheel diameter stored in the standard system.…”
Section: Methodsmentioning
confidence: 99%
“…The point on the tread surface, which is 70 mm from the inside of the wheel, is defined as the base point, and the circle formed by the base point along the circumference of the wheel is called the rolling circle [20]. At present, the diameter of the rolling circle is manually measured using a wheel diameter gauge on the spot, and the tread wear is obtained by subtracting the current wheel diameter from the wheel diameter stored in the standard system.…”
Section: Methodsmentioning
confidence: 99%
“…Therefore, there are 10 train legs and 55 OD pairs on the train. Such a number of stopping stations is very common for high‐speed trains on the Beijing–Shanghai high‐speed railway line (Luo et al., 2015). To see the performances of different controls under different train capacity, the number of seats on the train is taken from the collection false{800,850,900,,1200false}$\{800,850,900,\text{\ensuremath{\cdots}},1200\}$.…”
Section: Numerical Experiencesmentioning
confidence: 99%
“…In order to optimize the utilization of this network and ensure its reliability, it is inevitable to establish additional procedures for strengthening the cooperation on alignment of international train journeys for freight trains among infrastructure managers [9][10][11].…”
Section: Specific Features Of Selected Corridors In the Selected Countrymentioning
confidence: 99%