2023
DOI: 10.1061/(asce)cf.1943-5509.0001777
|View full text |Cite
|
Sign up to set email alerts
|

Regional Multihazard Risk-Assessment Method for Overhead Transmission Line Structures Based on Failure Rate and a Bayesian Updating Scheme

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 42 publications
0
1
0
Order By: Relevance
“…A structure must operate at a serviceability level for a period of time associated with a certain reliability indicator. The reliability indicator is used as a metric to express the safety level of the system and is available in the literature expressed as the number of times when the structural demand is exceeded by the structural capacity considering the corresponding uncertainties (confidence factor, index β) [3,4], the number of times that an interest threshold is exceeded per year (exceedance demand rate) [5,6], or the number of times per year that structure failure is expected (mean annual failure rate) [7,8]. Reliability indicators help mitigate risk in the retrofit of existing structures or design of new systems.…”
Section: Introductionmentioning
confidence: 99%
“…A structure must operate at a serviceability level for a period of time associated with a certain reliability indicator. The reliability indicator is used as a metric to express the safety level of the system and is available in the literature expressed as the number of times when the structural demand is exceeded by the structural capacity considering the corresponding uncertainties (confidence factor, index β) [3,4], the number of times that an interest threshold is exceeded per year (exceedance demand rate) [5,6], or the number of times per year that structure failure is expected (mean annual failure rate) [7,8]. Reliability indicators help mitigate risk in the retrofit of existing structures or design of new systems.…”
Section: Introductionmentioning
confidence: 99%