2015
DOI: 10.12988/ams.2015.410852
|View full text |Cite
|
Sign up to set email alerts
|

Project scheduling method using triangular intuitionistic fuzzy numbers and triangular fuzzy numbers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
15
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 15 publications
(15 citation statements)
references
References 5 publications
0
15
0
Order By: Relevance
“…In this paper, metric distance ranking method is introduced to identify the (Atanassov) intuitionistic fuzzy critical path. And also we used Rezvani [12] ranking method, Euclidian Distance measure [10] similarity ranking method [15], and graded Journal of Applied Mathematics mean integration ranking method to rank the path. Using Definitions 8 and 11 of ranking methods, we cannot suitably identify the required optimal path.…”
Section: Resultsmentioning
confidence: 99%
See 4 more Smart Citations
“…In this paper, metric distance ranking method is introduced to identify the (Atanassov) intuitionistic fuzzy critical path. And also we used Rezvani [12] ranking method, Euclidian Distance measure [10] similarity ranking method [15], and graded Journal of Applied Mathematics mean integration ranking method to rank the path. Using Definitions 8 and 11 of ranking methods, we cannot suitably identify the required optimal path.…”
Section: Resultsmentioning
confidence: 99%
“…Definition 9 (Euclidean Ranking (ER) technique for trapezoidal (Atanassov) intuitionistic fuzzy numbers [10]). Let = {( , , , )( , , , )} be the th fuzzy path length and let max = {( , , , )( , , , )} = ( max , max ) be the fuzzy longest length then the Euclidean Ranking of is denoted by…”
Section: Definition 3 (Trapezoidal Intuitionistic Fuzzy Number) An (mentioning
confidence: 99%
See 3 more Smart Citations