Penjadwalan Berdasarkan Analisis Faktor-Faktor Penyebab Keterlambatan Proyek Reparasi Kapal: Studi Kasus MV. Blossom

Abstract: Reparasi kapal merupakan sebuah proyek yang singkat dalam prosesnya sehingga waktu merupakan elemen kritis sebagai parameter penyelesaian. Keterlambatan waktu merupakan suatu peristiwa yang dapat terjadi pada setiap proyek. Suatu proyek cenderung mengalami keterlambatan apabila buruknya manajemen proyek dan juga kesalahankesalahan yang disebabkan oleh sumber daya manusia didalamnya. Studi ini menganalisa faktor penyebab keterlambatan pada proyek reparasi kapal MV. Blossom dengan menggunakan metode Fault Tree A… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
4
0
1

Year Published

2022
2022
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 0 publications
0
4
0
1
Order By: Relevance
“…In the field of risk assessment, Bayesian Networks' capacity to use both quantitative and qualitative data to produce posterior probabilities is particularly helpful. The probability of a child node C given that the parent node is true is known as the conditional probability and is represented by the symbol P (Pt | C) [11]. Bayes' theorem serves as the foundation for the relationship between nodes in Bayesian networks, which can be expressed as follows:…”
Section: A Descriptionmentioning
confidence: 99%
“…In the field of risk assessment, Bayesian Networks' capacity to use both quantitative and qualitative data to produce posterior probabilities is particularly helpful. The probability of a child node C given that the parent node is true is known as the conditional probability and is represented by the symbol P (Pt | C) [11]. Bayes' theorem serves as the foundation for the relationship between nodes in Bayesian networks, which can be expressed as follows:…”
Section: A Descriptionmentioning
confidence: 99%
“…Adiluhung Saranasegara is a poor scheduling so that the plan and realization of the work are not achieved [12]. According to Padaga (2018) in a case study at PT. PAL Indonesia (Persero) the project management process was disrupted due to several things, among others, due to supervision when the work was not going well, evaluation of work results was not carried out because work notes were not conveyed to other departments, and lack of coordination between the shipyard and the shipowner [13].…”
Section: Project Managementmentioning
confidence: 99%
“…According to Padaga (2018) in a case study at PT. PAL Indonesia (Persero) the project management process was disrupted due to several things, among others, due to supervision when the work was not going well, evaluation of work results was not carried out because work notes were not conveyed to other departments, and lack of coordination between the shipyard and the shipowner [13]. From some these problems, it was also decided to provide a feature to oversee ship repair project activities as well as a feature to report results and job evaluations that can be accessed by internal and external parties at the shipyard and shipowner who has responsibility for the jobdesk.…”
Section: Project Managementmentioning
confidence: 99%
“…Sebelum kegiatan crashing, pertama dilakukan harus membuat network planning (penjadwalam proyek) terlebih dahulu untuk mengetahui lintasan kritis pada kegiatan proyek. Lintasan kritis dapat memberi acuan dalam penentuan kegiatan kritis pada pekerjaan tersebut (Padaga et al, 2018). Dapat dilihat pada gambar 2 untuk hubungan untuk Waktu-Biaya Normal dan Dipersingkat.…”
Section: Mempercepat Waktu Penyelesaian Proyek (Percepatan Durasi)unclassified