2014 International Conference on Control, Decision and Information Technologies (CoDIT) 2014
DOI: 10.1109/codit.2014.6996907
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of integrated employee timetabling and Hybrid Job Shop Scheduling under time lag constraints

Abstract: This paper studies two important problems, often encountered in the manufacturing industry and particularly in the tanneries: human resources planning and production scheduling. In this work, we focus on the problem that integrates Employee Timetabling [ETP] by considering their skills under various constraints, with a Hybrid Job-Shop Scheduling [HJS] under time lag constraints. After presenting and formulating our problem as a Mixed Linear Program, we propose a resolution method based on decomposition and cut… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 12 publications
(10 reference statements)
0
1
0
Order By: Relevance
“…In manufacturing systems, machine and operator are among the most considered resources, and they are often studied separately (Pinedo, 2002). To represent real systems better, machine and operator need to be considered simultaneously in scheduling (Van den Bergh, Beliën, De Bruecker, Demeulemeester & De Boeck, 2013), such as in Mencía, Sierra, Mencía and Varela (2015) and Frihat, Sadfi and Hadj-Alouane (2014). Mencía et al (2015) proposed a simultaneous scheduling model of machine and operator, considering operation sequence to minimize makespan in job shop production systems, while Frihat et al (2014) proposed scheduling model to minimize personnel cost, considering time lag between operations and due date.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In manufacturing systems, machine and operator are among the most considered resources, and they are often studied separately (Pinedo, 2002). To represent real systems better, machine and operator need to be considered simultaneously in scheduling (Van den Bergh, Beliën, De Bruecker, Demeulemeester & De Boeck, 2013), such as in Mencía, Sierra, Mencía and Varela (2015) and Frihat, Sadfi and Hadj-Alouane (2014). Mencía et al (2015) proposed a simultaneous scheduling model of machine and operator, considering operation sequence to minimize makespan in job shop production systems, while Frihat et al (2014) proposed scheduling model to minimize personnel cost, considering time lag between operations and due date.…”
Section: Literature Reviewmentioning
confidence: 99%