2016
DOI: 10.1016/j.energy.2016.06.132
|View full text |Cite
|
Sign up to set email alerts
|

Optimal probabilistic based storage planning in tap-changer equipped distribution network including PEVs, capacitor banks and WDGs: A case study for Iran

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
31
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 45 publications
(31 citation statements)
references
References 22 publications
0
31
0
Order By: Relevance
“…In addition, the BSSs described in reference [25] operate on the basis of a fixed length of charge and discharge periods, which was later extended [26] for flexible charge and discharge periods, though still with a fixed length of charge-discharge cycles. It is noted that the work in reference [26] provides identical operation strategies for different BSSs, which was later improved [122,123] by determining optimal decision variables for each individual BSS, resulting in a more complex and larger optimization problem.…”
Section: X(t) = G(x(t) U(t) L(t) Y(t)) X(tmentioning
confidence: 99%
See 1 more Smart Citation
“…In addition, the BSSs described in reference [25] operate on the basis of a fixed length of charge and discharge periods, which was later extended [26] for flexible charge and discharge periods, though still with a fixed length of charge-discharge cycles. It is noted that the work in reference [26] provides identical operation strategies for different BSSs, which was later improved [122,123] by determining optimal decision variables for each individual BSS, resulting in a more complex and larger optimization problem.…”
Section: X(t) = G(x(t) U(t) L(t) Y(t)) X(tmentioning
confidence: 99%
“…in a prediction horizon. Compared to other studies [25,26,122,123], this work determines fully flexible optimal operation strategies for BSSs, i.e., length of charge and discharge periods and length of charge-discharge cycles, and the number of cycles in the prediction horizon are decision variables to be optimized while considering the expended life costs of the batteries [219] in the objective function.…”
Section: Opf-based Rt-emssmentioning
confidence: 99%
“…2) Case 2 In Case 2, minimizing the diurnal operating costs of regional ADS from (18) and (19). Three different planning results are shown in Table 5.…”
Section: ) Power Output Characteristics Of Mgsmentioning
confidence: 99%
“…The roles are modeled as different costs and the penalty factor in the objective function. In [18], authors extend their work in [17] to take electric vehicles (EVs) into account. A point estimate method serves to tackle the uncertainties of load, REGs, and EVs.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation