2004
DOI: 10.1287/opre.1040.0131
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Policies for a Capacitated Two-Echelon Inventory System

Abstract: This paper demonstrates optimal policies for capacitated serial multiechelon production/inventory systems. Extending the Clark and Scarf (1960) model to include installations with production capacity limits, we demonstrate that a modified echelon base-stock policy is optimal in a two-stage system when there is a smaller capacity at the downstream facility. This is shown by decomposing the dynamic programming value function into value functions dependent upon individual echelon stock variables. We show that the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

3
79
0

Year Published

2008
2008
2023
2023

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 81 publications
(82 citation statements)
references
References 28 publications
3
79
0
Order By: Relevance
“…Proposition 1 (Parker and Kapuscinski (2004): Corollary 1(b) and Remark 2) Let E nt be the echelon n inventory position at the start of period t. Assume that E n1 − E (n−1)1 ≤ l n · C. Then, any policy that leads to a state where…”
Section: Sequence Of Eventsmentioning
confidence: 99%
See 1 more Smart Citation
“…Proposition 1 (Parker and Kapuscinski (2004): Corollary 1(b) and Remark 2) Let E nt be the echelon n inventory position at the start of period t. Assume that E n1 − E (n−1)1 ≤ l n · C. Then, any policy that leads to a state where…”
Section: Sequence Of Eventsmentioning
confidence: 99%
“…The only result that has been proved about the structure of the optimal policy for a serial system with capacities is due to Parker and Kapuscinski (2004). They consider a two echelon serial system of the type we described earlier assuming the lead time between L 3 and L 2 is one period and assuming the lead time between L 2 and L 1 is an arbitrary, deterministic integer.…”
Section: Develops a Cost Evaluation Techniquementioning
confidence: 99%
“…Parker and Kapuscinski (2004) also analyze a two-stage serial system, and show that a modified echelon base-stock (MEBS) policy is optimal, when the tightest capacity constraint is at the downstream stage and there is a single period lead-time at the upstream stage. For these assumptions the MEBS policy is the same as the censored ordering…”
Section: Literature Reviewmentioning
confidence: 99%
“…The analysis of multi-echelon inventory systems has a long history, studies on inventory theory are mainly in two aspects, one is establishing inventory model under the different conditions andassumptions, and another is using reasonable method to solve the problem of inventory optimization. In the aspect of inventory model, Andersson & Melchiors studied the two-echelon inventory model with lost sales [1] , 2001; Chiang & Monahan established the dual-channel supply chain model [2] , 2005; Dong & Lee researched a serial multi-echelon inventory system with time-correlated demand [3] , 2003; Mitra analyzed a two-echelon inventory system with returns [4] , 2009; Parker & Kapuscinski present a optimization model for a capacitated two-echelon inventory system [5] . In this paper, considering the system spare parts' structure, which is divided into two levels, the multi-echelon support evaluation model for system spare parts is researched.…”
Section: Introductionmentioning
confidence: 99%