Optimal material release times in stochastic production environments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2002
2002
2016
2016

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 15 publications
(8 citation statements)
references
References 0 publications
0
8
0
Order By: Relevance
“…Once the aggregate order release plan is determined, the selection of the orders to be released within this`budget' can be based on short-term information, such as urgency of the orders. (Models for non-hierarchical order release planning are presented in Hasan andHomem-de-Mello et al 1999. ) .…”
Section: H Missbauermentioning
confidence: 98%
“…Once the aggregate order release plan is determined, the selection of the orders to be released within this`budget' can be based on short-term information, such as urgency of the orders. (Models for non-hierarchical order release planning are presented in Hasan andHomem-de-Mello et al 1999. ) .…”
Section: H Missbauermentioning
confidence: 98%
“…However, for problems with many time periods and products, this results in a very large decision space. Hasan and Spearman [39] consider the problem of determining the optimal release times for a fixed sequence of work using a simulation-optimization approach based on infinitesimal perturbation analysis. This approach is further developed by Homem de Mello et al [40].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Setting planned lead-times or activity start times in the situations with stochastic processing times was reported in Yano (1987a,b), Gong et al (1994), Matsuura et al (1996), Molinder (1997), Hasan and Spearman (1999), Song et al (2001) and Elmaghraby et al (2000). However, the majority of the above research is limited to relative simple environments such as one or two stage assembly systems (Yano, 1987a), serial production line (Yano, 1987b, Gong et al, 1994, non-assembly job shop (Matsuura and Tsubone, 1993, Matsuura et al, 1996, Hasan and Spearman, 1999, Emaghraby et al, 2000. This paper considers general multistage assembly systems operating on a make to order basis with stochastic processing times.…”
Section: Introductionmentioning
confidence: 99%