Operation window constrained strategic energy management of microgrid with electric vehicle and distributed resources

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
26
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 45 publications
(27 citation statements)
references
References 18 publications
(17 reference statements)
0
26
0
Order By: Relevance
“…So the DSO should elaborate a suitable trading plan in the deployment-ahead horizon, in order to program all factors accounting for economic burdens, environmental impact and reliability issues [75][76][77]. During the process of designing the trading plans, possible deviations of forecasts with proper probability distribution functions [78][79][80], procedures based on the generation of different scenarios with relevant probability [81][82][83][84], and methodologies based on deterministic data [49,[85][86][87][88] should be taken into account. In addition, the penalty mechanism should be constructed to hedge against the aggregators' failure to execute the V2G ancillary service [89].…”
Section: Management Measures Of Phasementioning
confidence: 99%
“…So the DSO should elaborate a suitable trading plan in the deployment-ahead horizon, in order to program all factors accounting for economic burdens, environmental impact and reliability issues [75][76][77]. During the process of designing the trading plans, possible deviations of forecasts with proper probability distribution functions [78][79][80], procedures based on the generation of different scenarios with relevant probability [81][82][83][84], and methodologies based on deterministic data [49,[85][86][87][88] should be taken into account. In addition, the penalty mechanism should be constructed to hedge against the aggregators' failure to execute the V2G ancillary service [89].…”
Section: Management Measures Of Phasementioning
confidence: 99%
“…In this paper, the energy exchange among H-MGs is formulated as a scheduling game, and competitive monopolies are modeled and simulated in a formulated non-linear optimization problem [23], [24]. These monopolies are based on three contradictory objectives: income maximization of H-MGs and retailers, reduction of consumer costs, and reduction of demand peak [25].…”
Section: Introductionmentioning
confidence: 99%
“…In this situation, MG has to import an amount of power from the utility grid with high price in order to maintain power balance, resulting in operation cost increase. MG operation can be optimized by various strategies, such as the application of various control approaches for MG [21,22], the additional penetration of electric vehicles and distributed resources [23], or the advance of internet data centers in MG [24]. Furthermore, with the application of DR programs, the load can be shifted from peak periods to off-peak periods so that the operation cost can be decreased [25].…”