2017
DOI: 10.1007/s10033-017-0187-0
|View full text |Cite
|
Sign up to set email alerts
|

Online Condition Monitoring of Gripper Cylinder in TBM Based on EMD Method

Abstract: The gripper cylinder that provides braced force for Tunnel Boring Machine (TBM) might fail due to severe vibration when the TBM excavates in the tunnel. Early fault diagnosis of the gripper cylinder is important for the safety and efficiency of the whole tunneling project. In this paper, an online condition monitoring system based on the Empirical Mode Decomposition (EMD) method is established for fault diagnosis of the gripper cylinder while TBM is working. Firstly, the lumped mass parameter model of the grip… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 26 publications
(25 reference statements)
0
4
0
Order By: Relevance
“…In construction process field, 20 out of 61 observations were made regarding the construction of buildings, dams, roads, and tunnels. Within this field, the 60 out of 202 observations covered topics such as construction delays [22], crane, drilling and excavation tasks [14,18,24,39,48,70,74]; geological conditions [54], scaffolding collapse [68]; transport delays [31]; tunnelling [28,36,37,41,43,55,67]; workers and machinery location [34,40]. According to Erzaij et al [22], project suspensions are among the most persistent tasks facing the construction sector, due to the difficulty of the industry and the essential interdependence between the bases of delay risk.…”
Section: Discussion and Future Directionsmentioning
confidence: 99%
“…In construction process field, 20 out of 61 observations were made regarding the construction of buildings, dams, roads, and tunnels. Within this field, the 60 out of 202 observations covered topics such as construction delays [22], crane, drilling and excavation tasks [14,18,24,39,48,70,74]; geological conditions [54], scaffolding collapse [68]; transport delays [31]; tunnelling [28,36,37,41,43,55,67]; workers and machinery location [34,40]. According to Erzaij et al [22], project suspensions are among the most persistent tasks facing the construction sector, due to the difficulty of the industry and the essential interdependence between the bases of delay risk.…”
Section: Discussion and Future Directionsmentioning
confidence: 99%
“…e Hilbert-Huang Transform (HHT) includes the empirical mode decomposition (EMD) and the Hilbert time spectrum [31,32]. Firstly, the signal is decomposed into several inherent mode functions (IMF) by the EMD method.…”
Section: Hilbert-huang Transform and Svmmentioning
confidence: 99%
“…The current researches focus mainly on shield machine or shield type TBM, which make the position and posture rectification by adjusting the distribution of thrust pressure in corresponding thrust cylinders working zone. However, the mechanical structure of open type hard rock TBM is different from shield machines [9][10][11]. Gripper carrier assembly is used for deviation rectification of open type TBM rather than thrust system in shield machine.…”
Section: Introductionmentioning