On the Quantification of the Network Capacity Deferral Value of Distributed Generation

Abstract: This paper presents an approach to the quantification of the distribution network capacity deferral value of distributed generation (DG). Besides different technical benefits such as reliability and power quality improvement, there are a number of economic benefits related to DG, the most important of which being the end-user electricity bill reduction capability. However, since the onset of the implementation of these technologies, the potential of DG to defer investments on distribution wires and transformer… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
92
0

Year Published

2009
2009
2014
2014

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 161 publications
(92 citation statements)
references
References 5 publications
0
92
0
Order By: Relevance
“…However, a more sophisticated approach that automatically detects and accounts for each deferral opportunity is required. With further work an approach similar to [4] or [36] could be implemented within the multi-year multi-period OPF framework.…”
Section: Discussionmentioning
confidence: 99%
“…However, a more sophisticated approach that automatically detects and accounts for each deferral opportunity is required. With further work an approach similar to [4] or [36] could be implemented within the multi-year multi-period OPF framework.…”
Section: Discussionmentioning
confidence: 99%
“…This effect is even known as "non-wire solution" [16], to meet the load growth. One method for exact calculation of this deferral is integrated planning models [17] in which network reinforcement and DG planning are performed simultaneously.…”
Section: ) Total Incentive For Network Reinforcement Deferralmentioning
confidence: 99%
“…This effect is even known as "non-wire solution" [20], to meet the load growth. One method for exact calculation of this deferral is integrated planning models [12] in which network reinforcement and DG planning are performed simultaneously.…”
Section: ) Total Incentive For Network Reinforcement Deferralmentioning
confidence: 99%