2009
DOI: 10.1049/iet-gtd:20080235
|View full text |Cite
|
Sign up to set email alerts
|

Assessing the strategic benefits of distributed generation ownership for DNOs

Abstract: The potential for distributed generation (DG) to act as an alternative distribution planning option is now well-recognised by academia and industry, and could play a significant role in electricity distribution utility operation and design. However, the unbundling requirements of European Directive 2003/54/EC, coupled with traditional network planning approaches adopted by European Distribution Network Operators (DNOs), appear to be hindering development of DG and its deployment for distribution network ancill… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
54
0
4

Year Published

2010
2010
2021
2021

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 93 publications
(58 citation statements)
references
References 19 publications
0
54
0
4
Order By: Relevance
“…One of the appropriate models reported in the literature is calculating the difference between total loss of the system before and after DG placement [1], [5], [14], [16], [18].…”
Section: ) Total Incentive For Active Loss Reductionmentioning
confidence: 99%
See 2 more Smart Citations
“…One of the appropriate models reported in the literature is calculating the difference between total loss of the system before and after DG placement [1], [5], [14], [16], [18].…”
Section: ) Total Incentive For Active Loss Reductionmentioning
confidence: 99%
“…In some models [16], the DNO should pay/receive equal to the electricity price multiplied by amount of loss reduction/increase and in some models [1], [5], [14], [18] a fix incentive, i.e. ψ, is paid to DNO for each MWh reduction of active losses .…”
Section: ) Total Incentive For Active Loss Reductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Within the European regulatory framework [4][5][6][7] DSOs are not allowed to own generation plants, except for a small number of legacy plants [8] or to manage system losses as in the Belgian Walloon region [9]. This considerably impacts planning activities of DSOs since the lack of coordination between network and generation planning can lead to inefficiencies in electricity supply infrastructure.…”
Section: Introductionmentioning
confidence: 99%
“…In [8] the need for schemes and practices to provide incentives for DG deployment for the benefit of the network was identified considering different regulations for DSO ownership of DG. This work specifically criticized European regulatory framework and points out difficulties brought by the fact DSOs are not allowed to own generation.…”
Section: Introductionmentioning
confidence: 99%