2015
DOI: 10.1007/978-3-319-27221-4_4
|View full text |Cite
|
Sign up to set email alerts
|

Multi-zone Building Control System for Energy and Comfort Management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
2
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 6 publications
0
2
0
Order By: Relevance
“…The additional costs that are incurred during the maintenance and rectification of control problems at a later stage of the operation can, thus, be avoided. The building energy system models developed so far use dynamic modeling and undergo simulations to test the detailed design, where the cost of error removal is high [29,30]. Such models have embedded conventional control techniques, such as on-off, PI, and PID control.…”
Section: Literature Surveymentioning
confidence: 99%
See 1 more Smart Citation
“…The additional costs that are incurred during the maintenance and rectification of control problems at a later stage of the operation can, thus, be avoided. The building energy system models developed so far use dynamic modeling and undergo simulations to test the detailed design, where the cost of error removal is high [29,30]. Such models have embedded conventional control techniques, such as on-off, PI, and PID control.…”
Section: Literature Surveymentioning
confidence: 99%
“…A f loor = −1.115 0.223 0.03936 −0.07085 (29) where A floor = Coefficient matrix for floor wall building envelope model.…”
Section: Stability Analysis Of Building Envelope Modelmentioning
confidence: 99%
“…The set (N − a) is defined by the user and sensory data. The same equation can be used four times to complete one cycle of 24 h, and in each scheduling window, there is a different set of appliances based on the user preferred time and sensor inputs, as can be seen in Equations (20) to (23).…”
Section: Scenario 4: Ems By Using Scenario 2 + Scenariomentioning
confidence: 99%
“…Indeed, energy and comfort trade-off in buildings is absorbing interest of many researches around the world. Various aspects of this research domain have been investigated so far [9]- [12]. Enormous attention should be paid to occupants' comfort which is a main concern for building's intelligence.…”
Section: Introductionmentioning
confidence: 99%