Proceedings of the 2015 (6th) International Conference on Engineering, Project, and Production Management 2015
DOI: 10.32738/ceppm.201509.0051
|View full text |Cite
|
Sign up to set email alerts
|

Major Factors Affecting Waste Generation on Construction Sites in Iran

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(13 citation statements)
references
References 0 publications
0
13
0
Order By: Relevance
“…The C and D wastes generation generally occur due to a lack of awareness and skills among construction workers at various stages of the construction process. Nikmehr et al (2015) and Khaleel and Al-Zubaidy (2018) reported that the lack of performance among construction workers and awareness of waste generation was significantly correlated. A large amount of C&D waste had a negative impact on the economy and exploiting natural resources and causing irreparable environmental harm.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The C and D wastes generation generally occur due to a lack of awareness and skills among construction workers at various stages of the construction process. Nikmehr et al (2015) and Khaleel and Al-Zubaidy (2018) reported that the lack of performance among construction workers and awareness of waste generation was significantly correlated. A large amount of C&D waste had a negative impact on the economy and exploiting natural resources and causing irreparable environmental harm.…”
Section: Literature Reviewmentioning
confidence: 99%
“…When timber or metal are being cut without considering the next usage, the excess becomes waste. This factor is one of the highest regarding the volume of waste in waste production [31,32].…”
Section: Cutting Uneconomical Sizes Of Materialsmentioning
confidence: 99%
“…All materials received at site should be unpacked and arranged properly to avoid any damage [23,[31][32][33]. If the materials are not handled with care, damage can occur generating construction waste [36,38].…”
Section: Improper Materials Handling By the Workersmentioning
confidence: 99%
See 1 more Smart Citation
“…issues of construction waste generation, as per the research findings, poor site supervision and management, poor planning and scheduling, inexperience hired staff, errors and mistakes occurs in designs and mistakes during construction are essential factors responsible for construction site waste.Recently, in Iran a research discoveredthe major causes of construction waste occurrence at sites i.e.lack of skills, lack of knowledge of demolition, use of old methods of construction, low quality material, inappropriate method for shipment and frequent demolition [13]. Errors in design, frequent changes in design, inexperience workers, weather effect and failure of equipment at site during construction works are most essential causes of construction waste in under developed regions of world [14]. The literature is rich in different regions globally related to construction waste, however this research study based on identifying the waste generation factors in Sindh region, which fulfill the major gap in literature.…”
mentioning
confidence: 99%