2015
DOI: 10.1007/978-3-319-12301-1_3
|View full text |Cite
|
Sign up to set email alerts
|

Maintenance of Belt Conveyor Systems in Poland – An Overview

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 20 publications
(19 citation statements)
references
References 8 publications
0
15
0
Order By: Relevance
“…Known NDT methods studied and used for steel cord belts monitoring are based on electromagnetic measurements and include: inductive, reluctance, induced voltage, X-ray and ultrasonic techniques. Whereas, in case of fabric belts capacitive, ultrasonic and X-ray methods have been applied [24]. Fusing those methods with our approach would provide more comprehensive information for better understanding of conveyor belt characteristics and improved design and construction of conveyor belt systems.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Known NDT methods studied and used for steel cord belts monitoring are based on electromagnetic measurements and include: inductive, reluctance, induced voltage, X-ray and ultrasonic techniques. Whereas, in case of fabric belts capacitive, ultrasonic and X-ray methods have been applied [24]. Fusing those methods with our approach would provide more comprehensive information for better understanding of conveyor belt characteristics and improved design and construction of conveyor belt systems.…”
Section: Discussionmentioning
confidence: 99%
“…To support maintenance procedures, one may use SCADA systems [18], portable devices based on termography [19], vibration measurements [1,2], Internet of Things components [20] or robotic systems for inspection [21][22][23]. Summary on the maintenance of belt conveyors may be found in [24].…”
Section: Introduction 1belt Conveyor Maintenancementioning
confidence: 99%
“…Both the transport system and the skips were scheduled on a 24-hour basis. All belt conveyors were scheduled to be offline from 5 to 7 AM and at 6 PM due to rock blasting, shift change and maintenance works [25][26][27]. Consequently, down time of the skips was scheduled from 6 to 11 PM.…”
Section: Methodsmentioning
confidence: 99%
“…For this reason, the technical condition of infrastructure elements is regularly inspected. Operation and maintenance of mining assets are carried out by a properly trained maintenance worker with valid authorizations [1]. The schedule of periodic machine service strictly defines the scope of maintenance and repair activities for a given machine, carried out monthly, quarterly, semi-annually, and annually.…”
Section: Introductionmentioning
confidence: 99%