Load Monitoring at the Touchdown Point of the First Steel Catenary Riser Installed in a Deepwater Moored Semisubmersible Platform

Abstract: A 10-inch Steel Catenary Riser (SCR) was installed in the Petrobras XVIII semi-submersible production platform, moored in 910 meters water depth in the Marlim field, Campos Basin, offshore Brasil. This is the first SCR ever installed on a floating moored platform. In order to evaluate and verify the methodologies and to calibrate the numerical models used in the riser, mooring system, and platform design, it was necessary to establish a monitoring program for all the relevant parameters (envi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

1999
1999
2015
2015

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Instrumentation systems have progressed a long way since the early systems deployed on the P18 steel catenary riser [2] and the field tow test conducted for the STRIDE joint industry project [3]. Instrumentation systems have progressed a long way since the early systems deployed on the P18 steel catenary riser [2] and the field tow test conducted for the STRIDE joint industry project [3].…”
Section: Introductionmentioning
confidence: 99%
“…Instrumentation systems have progressed a long way since the early systems deployed on the P18 steel catenary riser [2] and the field tow test conducted for the STRIDE joint industry project [3]. Instrumentation systems have progressed a long way since the early systems deployed on the P18 steel catenary riser [2] and the field tow test conducted for the STRIDE joint industry project [3].…”
Section: Introductionmentioning
confidence: 99%
“…

In August 1998, a 10-inch Steel Catenary Riser (SCR) was installed on the Petrobras XVIII semi-submersible production platform, moored in 910 meters water depth in the Marlim field, Campos Basin, offshore Brazil [1]. The TDP monitoring system was described in Edwards 1999 [3]. The TDP monitoring system was described in Edwards 1999 [3].

…”
mentioning
confidence: 99%