2017
DOI: 10.1016/j.enconman.2017.09.047
|View full text |Cite|
|
Sign up to set email alerts
|

Levelised Cost of Storage for Pumped Heat Energy Storage in comparison with other energy storage technologies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
51
0
1

Year Published

2018
2018
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 194 publications
(73 citation statements)
references
References 20 publications
0
51
0
1
Order By: Relevance
“…• PTES based on a Brayton cycle with packed beds [6][7][8][9], sensible molten salt [5] or concrete as thermal storages [10,11]. • PTES based on transcritical CO2 with water as hot storage and latent water/ice as cold storage [12][13][14].…”
Section: A Pumped Thermal Energy Storage (Ptes)mentioning
confidence: 99%
“…• PTES based on a Brayton cycle with packed beds [6][7][8][9], sensible molten salt [5] or concrete as thermal storages [10,11]. • PTES based on transcritical CO2 with water as hot storage and latent water/ice as cold storage [12][13][14].…”
Section: A Pumped Thermal Energy Storage (Ptes)mentioning
confidence: 99%
“…PHES stores electricity as sensible heat in thermally insulated and closed-looped thermal storage systems which ensures that the system is isolated; hence, based on the design aspects outlined in [47], there is a guarantee that the model is feasible for deployment for our case study. The analysis of a proposed commercial PHES design with a maximum capacity of 16 MWh as detailed in [45,61] has been adopted as the benchmark for many studies in the literature; thus, the system technical and economic specifications are used in our work for the Kenyan microgrid under study.…”
Section: Off-peak Period Peak Periodmentioning
confidence: 99%
“…A.2. Specific cost of refractory, screfr 0.45 € kg -1 [72] Specific cost of sorbent, scCaO 0.02 € kg -1 [73] Specific cost of oxygen carrier, scCu 6 € kg -1 [73] Specific cost of catalyst, scNi 50 € kg -1 [72] Specific cost of inert, scAl2O3(NiO) 1 € kg -1 [73] Specific cost of heat exchanger/condenser, scHE/cond 241 € m -2 [70] Specific cost of hydrogen buffer, scbuffer 1,200 € m -3 [74] Specific cost of boiler, scB 150 € kW -1 [75] Specific cost of MCHP, scMCHP 2,500 € kW -1 [65] Specific cost of EHP, scEHP 500 € kW -1 [75] Unit price of natural gas, UPNG 0.013 € kWh -1 [76] Unit price of methane, UPCH4 0.019 € kWh -1 [76] Unit price of electric energy, UPee 0.1 € kWh -1 [77] Maintenance cost of boiler, MB 0.20 € h -1 [75] Maintenance cost of MCHP, MMCHP 0.20 € h -1 [75] Maintenance cost of EHP, MEHP 0.05 € h -1 [75] Maintenance cost of the proposed system, Mps 2% of TCRps per annum [76] CO2 transport and storage cost, CTS 82 € tCO2 -1 [78]…”
Section: A1 Energy and Environmental Analysismentioning
confidence: 99%