2011
DOI: 10.1108/13673271111137475
|View full text |Cite
|
Sign up to set email alerts
|

Knowledge‐mapping model for construction project organizations

Abstract: PurposeThe purpose of this study was to investigate and propose the appropriate K‐mapping models as an approach to integrating key project components and technologies for the effective improvement of project performance within and across construction projects.Design/methodology/approachIn this holistic, single‐case study, one of the largest construction consulting firms in South Korea has been studied by conducting 15 semi‐structured interviews and the different loci for each of the K‐mapping components are id… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
32
0
1

Year Published

2012
2012
2020
2020

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 39 publications
(33 citation statements)
references
References 68 publications
(93 reference statements)
0
32
0
1
Order By: Relevance
“…It allocates an organization to completely control the existing knowledge in the organization, as well as classify hurdles and limitation to fulfilling planned goals and objectives. It is constructing a roadmap to locate the information needed to make the best use of resources (Yun et al, 2011). While Tiwana (2002) emphasize that a K-map is used to build up theoretical charts as hierarchy or network, support knowledge script and report, and present strongly developed methods to draw and manuscript the conceptual models from variety of information sources like professionals.…”
Section: Knowledge Mappingmentioning
confidence: 99%
See 3 more Smart Citations
“…It allocates an organization to completely control the existing knowledge in the organization, as well as classify hurdles and limitation to fulfilling planned goals and objectives. It is constructing a roadmap to locate the information needed to make the best use of resources (Yun et al, 2011). While Tiwana (2002) emphasize that a K-map is used to build up theoretical charts as hierarchy or network, support knowledge script and report, and present strongly developed methods to draw and manuscript the conceptual models from variety of information sources like professionals.…”
Section: Knowledge Mappingmentioning
confidence: 99%
“…This K-mapping schematic can be used to create the policy for support K-maps to production of project organizations. This figure shows the different variables of schematic (Yun et al, 2011). knowledge in the processes they carry out and often make low level business assessment (Sommer, 2003),…”
Section: 52k-mapping Schematicmentioning
confidence: 99%
See 2 more Smart Citations
“…Most current researches on knowledge mapping tend to focus on the application of knowledge maps in diverse situations and for different purposes [6][7][8][9][10][11]. Hellstrom T (2004) studied the intellectual capital management in academic environments and argued that knowledge mapping may provide a fruitful avenue for it [6].…”
Section: Analysis On Domain Knowledgementioning
confidence: 99%