Proceedings of the 11th Asian Test Symposium, 2002. (ATS '02).
DOI: 10.1109/ats.2002.1181744
|View full text |Cite
|
Sign up to set email alerts
|

Integrated test scheduling, test parallelization and TAM design

Abstract: 1We

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
23
0

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 11 publications
(23 citation statements)
references
References 17 publications
0
23
0
Order By: Relevance
“…We have made a comparison between the cost estimation technique proposed in the paper and our previously developed test scheduling and TAM design tool in [7]. We have created a set of test specifications and for each such specification we have estimated the cost and evaluated the cost using the tool in [7].…”
Section: Resultsmentioning
confidence: 99%
See 4 more Smart Citations
“…We have made a comparison between the cost estimation technique proposed in the paper and our previously developed test scheduling and TAM design tool in [7]. We have created a set of test specifications and for each such specification we have estimated the cost and evaluated the cost using the tool in [7].…”
Section: Resultsmentioning
confidence: 99%
“…We have created a set of test specifications and for each such specification we have estimated the cost and evaluated the cost using the tool in [7]. Note that even though we only created a few test specifications the number of possibilities is high and will increase rapidly for larger designs.…”
Section: Resultsmentioning
confidence: 99%
See 3 more Smart Citations